Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Selective Grinding to Improve Copper Recovery at Mount Lyell

    By Bisshop J. P W

    Maximum recovery of sulphide minerals by flotation is achieved over a limited size range. Valuable particles above and below this range have a smaller probability of being recovered. In the normal

    Jan 1, 1977

  • AUSIMM
    Major Wear Parts in a Continous Copper Rod Plant and their Effect on Operations

    By Murphy MW, Klaric SD

    The history, operation and design of the Secor continuous rod production process is described. The effective operation of the plant is influenced by accurate monitoring and control of molten metal pro

    Jan 1, 1985

  • AUSIMM
    Application of Artificial Intelligence to Real Option Project Valuation and Mine Optimisation

    This paper describes preliminary research on the application of Markov Decision Processes (MDP) to Real Option Valuation (ROV) and the optimisation of mine scheduling. The MDP framework is a novel app

    Jan 1, 2007

  • AUSIMM
    Training in Project Development Actual Practice

    By Shanahorn C

    During the last decade the proper training of operating and maintenance staff has been recognised as directly contributing to the successful startup and continuing operations of a metallurgical pr

    Jan 1, 1986

  • AUSIMM
    Northparkes Copper-Gold Project

    By Stewart C. A

    The Northparkes copper-gold project is being developed in Central Western New South Wales approximately 30 km NNW of the town of Parkes and approximately 350 km west of Newcastle. The project is a j

    Jan 1, 1995

  • AUSIMM
    Geoscan AMSS Leads to Gold Mineralisation at Crossroads, Qld

    By Honey F. R, Furnell R. G, Lyon R. J P

    A Joint Venture between Union Oil Development Corporation and Geoscan Proprietary Limited carried out an Airborne Multispectral Scanner Survey over approximately 15,000 square kilometres in the C

    Jan 1, 1989

  • AUSIMM
    Method of Faceline Fall Recovery and Mining Strategy Developed to Imrpoved Longwall Availability at Cook Colliery

    By Adams DG

    At Cook Colliery a combination of main injection of the face coal, and mining into the floor has proved successful for the recovery of faceline falls.The strategy for preventing falls relies upon a co

    Jan 1, 1991

  • AUSIMM
    Automatic Control of Semi-Autogenous Grinding at Los Bronces

    By Toro HCH, Von Borries GH

    A brief description of the semi-autogenous grinding (SAG;) facilities of Compania Minera Disputada de Las Condes is given. A data-logging and computer system was connected to the plant inter facing th

    Jan 1, 1985

  • AUSIMM
    French Thick Seams Mining Practices

    The great variety of geological conditions in French coal deposits has obliged the industry to develop different thick seam mining methods. In very steep seams in a dense deposit where stowing is n

    Jan 1, 1976

  • AUSIMM
    Technology of Sulphidisation and Flotation of Non-Sulphide Minerals with Sodium Polysulphides

    By Bekturganov NS, Satayev I

    The paper deals with the effect of sodium polysulphides in chrysocolla flotation. Activity of elementary sulphur adsorption on the mineral surface is discussed. The mechanism of polysulphide action

    Jan 1, 1993

  • AUSIMM
    Optimum Drill and Blast

    The traditional concept of optimum drill and blast is that it is achieved when ore is produced at the lowest unit cost and, because of the complexities of most mining operations, represents a band w

    Jan 1, 1998

  • AUSIMM
    Golden Pig Mine Case Study

    The Golden Pig Mine is wholly owned by Bunnine Operations Limited and is located in the Yilgam Goldfields at Southern Cross, Western AustraliaThe paper briefly describes the geology and history of the

    Jan 1, 1993

  • AUSIMM
    Options in Research Oriented to Production Processes

    Interrelated data for five fundamental features of production processes would help promote the- development of the discipline and profession of extractive metallurgy. The features are the input ma

    Jan 1, 1986

  • AUSIMM
    Planning and Development of West Wallsend No.2 Colliery

    By Blackham M

    West Wallsend No. 2 Colliery is a new mine that is presently being developed in the New- castle Coalfield by J. & A. Brown & Abermain Seaham Collieries Ltd., a subsidiary of Coal & Allied Industries

    Jan 1, 1972

  • AUSIMM
    Computer-Aided Geomechanics

    The purpose, basic data requirements and various analysis/modelling tools employed for geomechanical evaluation of mine-site conditions are overviewed. The impact and application of computer techn

    Jan 1, 1983

  • AUSIMM
    Geology of Perseverance Nickel Deposit, Western Australia

    By Alichurch P. D

    Perseverance nickel deposit is located at latitude 27¦ 491S, longitude 1200 42'E, 330 km north of Kalgoorlie, Western Australia. Gossanous outcrops were discovered in April, 1971, and after fur

    Jan 1, 1973

  • AUSIMM
    Oxidation of Zinc Sulfide in a Fluidised Bed of Very Low Oxygen Concentration

    By Miyatani J. Asaki Z, Kondo Y

    The oxidation of sphalerite particles of 60 to 100 mesh size was studied in a fluidized bed of low 02 concentration at 900¦C. Par- tial pressure of 02 in the fluidizing 02-N2 gas mixture was chosen

    Jan 1, 1980

  • AUSIMM
    Petrology, Geochemistry and Tectonic Implications of Magmatism in Northern Hunter Ridge-Kadavu Island Group (Fiji). (772d3817-ba1c-497f-a5a8-fb10457552d2)

    By Eggins SM, Crawford AJ, Maillet P

    The Fiji Islands are remnants of a once continuous Solomon-Vanuatu-Fiji-Tonga volcanic arc (the Vitiaz arc), located at the boundary between the Indian-Australian and Pacific plates. They record a hi

    Jan 1, 1995

  • AUSIMM
    Three-Dimensional Date Imaging in Mine Geology Applications

    By Bacigalupo-Rose

    Simulations of complex physical phenomena, such as hurricanes and fluid flow around space vehicles, can now be effectively explored using modem visualisation techniques which have been developed to ex

    Jan 1, 1993

  • AUSIMM
    No. 3 Headframe

    To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa

    Jan 1, 1957