Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Raisebore drill string recovery case studyBy M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Staurolite Product DevelopmentBy S Benson
Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is
Jan 1, 2001
-
Mechanical Sampling PlantsIn 1997, the Australian coal industry through Standards Australia committee MN-001 Coal and Coke recognised the need to produce a Standard giving some instruction on how to inspect and audit mechanica
Jan 1, 2005
-
The Importance of Data Collection to the Blasting ProcessBy J Hutchings
An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat
Nov 8, 2011
-
A Numerical Approach for Prefeasibility Analysis of Tailings Disposal OptionsBy B Muller
The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel
Sep 26, 2011
-
Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter RiverBy D Stacey, J Matthews
Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The
Jan 1, 2001
-
Isasmelt - A 250 000 TPA Copper Smelting FurnaceMIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ
Jan 1, 1998
-
Benchmarks of Performance for Truck and Loader FleetsThe cost of production from truck and loader fleets is influenced by management development of the culture of the organisation, work practices, systems and procedures of the production and maintenance
Jan 1, 1992
-
Coal: Development of Nsw's Major Energy ResourceThe Energy Authority of NSW has wide powers and responsibilities conferred by its Act which are pertinent to the State's coal industry and its development into the next century. With respect
Jan 1, 1987
-
Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South AfricaBy R Moller
Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt
Jan 1, 2005
-
Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente MineBy P Yß±ez, G Ferguson
The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app
Jan 1, 2000
-
Drilling - Continuity - Mine PlanningThe AusIMM/AMIC code for reporting Reserves seeks to improve the calibre of professional reporting on this subject. But have they gone far enough? Should the code appreciate that the degree of reli
Jan 1, 1989
-
Current Trends and Implications of Environmental Regulation of Mining in the Northern TerritoryBy L. Gilbert
Recent changes to environmental legislation and trends in the environmental regulation of mining in the Northern Territory are being driven by (among other factors) Federal Government policies and
Jan 1, 1994
-
The Use of Reverse Cleaning in Testwork on Currawong Copper-Zinc OreLaboratory testwork was carried out on an overall orebody composite, of 2.9 per cent Cu and 4.2 per cent Zn, prepared from drill core taken from the Currawong fine-grained, copper-zinc massive sulphid
Jan 1, 1999
-
Creating optimised drill programs that add real value, and integrate with mine planningBy N Anderson
With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for
Mar 22, 2022
-
Measurement of Residual Shear Strength Using a Modified Direct Shear ApparatusBy L Tatnell, R Mackay, A Tolooiyan
The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is
Nov 5, 2014
-
The Future of Coal ExportsThis paper is in two parts. The first part provides background to coal in New Zealand, information on Solid Energy the Company and details of the resources, mines and products of the company. This par
Jan 1, 2000
-
The Mining Cycle at Gympie Eldorado Gold MinesBy I Levy
At our Monkland Mine at Gympie, we operate a deep, narrow vein gold mine using hand held equipment, rail mounted haulage and narrow shafts. This is in many respects the old-fashioned way and is well s
Jan 1, 1998
-
No assumptions, no surprisesBy G Deans, M Longbottom
OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte
Jul 1, 2021
-
Increasing Mine Profitability ù Technical Partnership to Reduce Coal LossBy D Hope, D Mitchell, B Metcalfe
In recent years there has been a major change among mining companies in their mining methods. This has been driven by the need to increase shareholder value and optimising the value from an operation.
Jan 1, 2001