Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Iron Ore Final Grinding by High Pressure Grinding Rolls and Air ClassificationBy F P. van der Meer, E Lessing, E Matthies
High pressure grinding rolls (HPGR) technology is growing to be a common comminution tool in iron ore processing. The technology finds a wide acceptance and presents specific benefits in coarse ore gr
Jul 13, 2015
-
Effects of Specific Charge and Electronic Delay Detonators on Fragmentation in an Aggregate Quarry – Building Fragmentation Model Design CurvesBy M Olsson, U Nyberg, K Widenberg, P Svedensten, F Ouchterlony
During 2007 and 2008, the project Optimal Fragmentation in Blasting II was conducted at the Långåsen quarry of NCC Roads AB near Arlanda. The main goals were:an evaluation of the effect of u
Aug 24, 2015
-
Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in ConcentrateBy M Spagnolo, M Ashley, D, L Reemeyer
PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in
Jan 1, 2003
-
Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and controlBy M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy
Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a
Aug 29, 2018
-
Bulk Mining Explosives ù Technical Tool or Commercial Commodity?By G Le Juge, K Waldock
The current suite of bulk mining explosives has been available to the industry for over 20 years. The flexibility and performance of ammonium nitrate based emulsion blend explosives were accepted by t
Jan 1, 2004
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Admixture use in cemented rock fillBy B Roache, J O’Brien, M Gray
Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing
Nov 29, 2022
-
New Blasting Initiation Technologies in the Mining IndustryAlfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
New Continuous Production System in Block Cave Mining – the Rock Flow SystemBy M Frenzel
At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu
May 9, 2016
-
Reducing Social Risk and Impact by Engaging Local CommunitiesIn todayÆs evolving and globalised world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to æengage
Jan 1, 2007
-
Homogeneity assessment of crushed and pulverised iron ore certified reference materials – implications for laboratory quality controlBy J Carter, B J. Armstrong
Best practice for the submission of samples to an internal or commercial laboratory requires quality control materials to be included for the purpose of independently and comprehensively assessing lab
Sep 18, 2023
-
Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and ManagementBy M Grigorescu, J H. Hodgkinson, H Alehossein
A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and
Nov 26, 2013
-
The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning IssuesThe Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the
Jan 1, 1999
-
The Evolution of Modern Canadian Shaft Sinking TechnologyThis paper deals with the evolution of Canadian shaft sinking technology over the last 15 years. Most, if not all, shaft excavation projects in Canada prior to 1990 were sunk using traditional benchin
Jan 1, 2002
-
Design of Copper-Cobalt Hydrometallurgical CircuitsCopper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni
Jan 1, 2008
-
RISKGATE and Underground OperationsBy J Harris, J Li, M Shi, P A. Kirsch, D Sprott
Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio
Mar 24, 2014
-
Strategies and Achievements for Moving Towards Minimum Wastes and Emissions in the Asian Steel IndustryBy D-J Min
Strategies and achievements in the Asian steel industry to construct industrial ecological chain are reviewed largely in the case of Japan, Korea and China. Emphasis is placed on the development of re
Jan 1, 2004
-
Mining Education ù Driven by Global ImpactsBy P J. McCarthy
Globalisation and consolidation is resulting in the mining industry coming to be dominated by a small number of very large companies seeking to lever assets and knowledge to create wealth. As an impor
Jan 1, 2001
-
Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the ResourceBy A M. Avis
This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain
Oct 5, 2011
-
Integrated process modelling for the Kalgoorlie Nickel SmelterBy G Sartor, A Rich, D Grimsey, R Forzatti, M White
An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen
Aug 21, 2024