Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Compatibility of Major Economic Criteria for Project Evaluation

    The most frequently applied project evaluation criteria are the Net Present Value, the Internal Rate of Return, and the Pay Back Period. Unfortunately, the Internal Rate of Return and the Pay Back Per

    Jan 1, 1991

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion (e832ca00-fad1-4d25-a701-ac8072a9e7d1)

    The first stage in the refining of lead blast furnace bullion is the removal of copper and is normally done as a batch process in open kettles.A number of attempts have been made to establish continuo

    Jan 1, 1963

  • AUSIMM
    The Kidston Gold Mine: A Development Challenge of a Low Grade Deposit

    The Kidston Gold Mine i s located in northern Queensland some 2 Ukm northwest of Townsville. I t is the largest gold mine in Australia and produces approximately 25 percent of Australia's gold an

    Jan 1, 1985

  • AUSIMM
    The Stabilisation Of Tailings Dumps Using Vegetative Cover At ZC/NBHC

    By Rogers J. F, Bird A. C

    The establishment of vegetation for dust control on tailings dams at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is outlined. The evolution of practices and te

    Jan 1, 1983

  • AUSIMM
    Draw Parameters and Reserve Estimation using PC-BC at the E26 Block Cave Mine, Northparkes NSW

    By Secis R

    Northparkes Mines is located 27 km northwest of Parkes in central west New South Wales. The E26 deposit is the largest of all defined to-date in the area, containing over 50 per cent of Northparkes&

    Jan 1, 1997

  • AUSIMM
    The Western Australian Mineral Research Centre: A Resource for Metallurgical Testwork and R&D

    The Mineral Research Centre is located at Perth in the suburb of Waterford, adjacent to Curtin University of Technology and within a Technology Precinct which includes Technology Park. The Centre,

    Jan 1, 1996

  • AUSIMM
    Developments in Diamond Drilling Deflection Equipment and Techniques at Broken Hill South Ltd.

    By Jones S. C

    A specific arc can be cut in hard rock formations using a specially designed multistep piloI bit, variable sized drift joint and long heavy control rod as a stabilizer rather than the Vaughan Thompson

    Jan 1, 1966

  • AUSIMM
    Experiences with Underground Sampling of Emplaced Hydraulic Fill

    The methods and equipment developed and used at the Mount Isa mine to obtain samples of uncemented hydraulic fill lying above major horizontal pillars are described. From existing underground developm

    Jan 1, 1976

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • AUSIMM
    Mineralisation of the Morobe Goldfield, Morobe Province, Papua New Guinea (888bc9dd-2413-4b17-98cf-f01418ee929d)

    By Mowat BA, Leach TM

    The Morobe Goldfield in Papua New Guinea has produced in excess of 120 tonnes of gold from predominantly alluvial sources. Hardrock gold has been mined historically at Wau (23t) and Edie Creek (40 an

    Jan 1, 1995

  • AUSIMM
    A Marginal Analysis of the Haulage Economics for Mining Open Pits by High Bench

    This paper reviews an analytical model that defines the relationship of weight-weighted or volume-weighted average haulage distance with bench height and other related parameters; presents the optim

    Jan 1, 1995

  • AUSIMM
    Mine Planning at Murrin-Murrin ù Modelling to Determine the Optimum Path

    The process of mine planning at AnacondaÆs nickel and cobalt laterite operation located at Murrin-Murrin in the Northern Goldfields of Western Australia is carried out in a number of stages in an ende

    Jan 1, 2003

  • AUSIMM
    Smart Solution to a Sticky Problem ù In-Mine Clay Mapping Using High-Resolution Geophysics

    By P J. Hawke

    Within the Mesa J pisolitic iron ore mine, clay is distributed unevenly throughout the deposit and often forms as pods and channels less than 10 m in width. The mine resource model, based on 50 m + 50

    Jan 1, 2002

  • AUSIMM
    Petrogenetic Relationships and Metallogeny Above Flat Subduction - The Example from Central Peru

    By R M. Tosdal

    Intrusion related ore deposits are widespread in the Central Peruvian Cordillera Occidental and adjacent high-plains to the east and include porphyry Cu (-Au, Mo; eg Morococha), Cu-Zn (Pb-) skarn (eg

    Jan 1, 2008

  • AUSIMM
    Ore Reserves Estimates And Comparisons With Mine Production From The Cattlegrid Orebody, Mt. Gunson, South Australia

    By Gelding P. W, van Herk H

    The Cattlegrid copper orebody is a concealed thin, tabular sheet localised near an unconformity between two sub- horizontal Precambrian sandstone units. It extends over an area of 1,000 m by 500 m

    Jan 1, 1979

  • AUSIMM
    Analysis of a Fire in a Colorado Coal Mine - A Case Study

    By Thimons E. D, Derick R. L

    In early June, 1986, a fire of unknown origin erupted in one of several main entries of a coal mine located in southwestern Colorado. The fire was aggressively fought with high-expansion foam. As a

    Jan 1, 1988

  • AUSIMM
    The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria

    By Mack JF

    A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant. Pilot plant results, together with laboratory investigations pro

    Jan 1, 1984

  • AUSIMM
    Implications of Fluid Inclusion Data on the Origin of the Hillgrove Gold-Antimony Deposits, N.S.W

    By Taylor G. R

    Fluid inclusions within quartz accompanying several stages of mineralization at Hillgrove are de cri bed. Pyrite-arsenopyrite-gold mineralization shows uncorrected filling temperatures of between 195&

    Jan 1, 1984

  • AUSIMM
    Technical Note - Different Rates of Dissolution of Zinc by Aeration of Sphalerite in Different Container Materials

    By Simes C. D

    Results of experiments for dissolution of zinc by aeration of sphalerite in glass, copper, galvanised iron and stainless steel vessels of identical dimensions are reported. It was found that in a glas

    Jan 1, 1984

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974