Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review ù Pillar Stability Issues at DOZ Block Cave Mine

    By D Flint, O Rindriatmoko

    PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi

    Jan 1, 2005

  • AUSIMM
    Computer Aided Design System for Mineral Beneficiation, Which Allows for Liberation

    By Prince R. G H, Guerney P. J, Frew J. A, Vanderkruk C. R, Wanigasekara-Mohoti D. K

    This computer-aided design system for mineral processing flowsheets which are based on froth flotation, size reduction and classification combines an expert system for generating flowsheet structure

    Jan 1, 1997

  • AUSIMM
    Integrating Measurement, Systems and Leadership to Build Safe, Productive Cultures

    By M I. Roberts

    As Australia’s mining industry painfully retrenches, mining executives and managers strive to remain viable by seeking significant productivity increases directly through process improvement and indir

    Nov 4, 2015

  • AUSIMM
    Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek Project

    By J Edman, RáBeamish, G Cambourn, B Beamish

    Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola

    Jul 1, 2013

  • AUSIMM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimising the Rate of Froth Recovery Using Outokumpu FrothMaster<sup>TM</sup>

    By P Bourke, S Ronkainen

    Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and re

    Jan 1, 2000

  • AUSIMM
    LIBS mineralogy – quantitative mineralogy on the belt

    By D Gagnon, P Bouchard, F Vanier, E Soares de Lima Filho, J El-Haddad, M Sabsabi, G J. Wilkie, A Beauchesne, A Hamel, A Blouin, T Vaillancourt, F Boismenu, A Harhira, A Plugatyr, C Padioleau

    Quantitative mineralogy is an established discipline in the geosciences and is aimed at providing mineral grade and texture information for geological and mineral processing applications. The two core

    Nov 10, 2020

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018

  • AUSIMM
    Commissioning of the Kanmantoo Copper Concentrator

    By J Seppelt

    The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th

    Oct 29, 2012

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines&apos; New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Acknowledgements (1726cf02-b79d-499d-92a9-156ed4eeb534)

    By BLAKE DAWSON WALDRON

    I must acknowledge my strategic adviser, Mr Lance Grimstone, who contributed to the development of this paper, and collated the text and figures.

    Jan 1, 1994

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    Applying Modular Transporters to Relocate Large Hydraulic Excavators

    By B Flynn, P Knights

    Low-loaders or &apos;floats&apos; for relocating equipment in surface mines are limited to a capacity of approximately 350 t. In the iron ore industry it is desirable to be able to rapidly relocate ex

    Jan 1, 2009

  • AUSIMM
    Mentoring - Fostering Relationships to Enrich Decision-Making

    Mother Nature controls, technical professionals model and miners decide. Decisions to explore, mine and mill. Mine decisions, mine design, planning and scheduling are subject to the quality of models

    Jan 1, 2006

  • AUSIMM
    The Past Focuses Support for the Future

    The history and milestones in the evolution of support systems utilised in the mass-mined chrysotile mines of Shabanie and King are discussed in detail. The use of block caving, false footwall or subl

    Jan 1, 2000

  • AUSIMM
    Multivariate Block Co-Simulation of an Iron Ore Deposit

    The Rio Tinto Iron Ore group currently estimates grade attributes for mineral resources using ordinary kriging (OK). OK produces a smoothed globally unbiased estimate, but does not capture local varia

    Sep 26, 2011

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • AUSIMM
    An estimation error

    By D A. Sims

    This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w

    May 24, 2023

  • AUSIMM
    What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage Operations

    By R Thompson, D Tulloch

    "Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and

    Nov 15, 2016