Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Surface Monitoring, Understanding and Modification at Molecular Level in Mineral Beneficiation by Infrared External Reflection Spectroscopy

    By E Mielczarski

    Determination of the adsorbed layer composition and structure at molecular and atomic levels and understanding adsorption mechanisms and dynamics are vitally important for the preparation of surface l

    Jan 1, 2005

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Abrasive Jet Cutting in Flammable Atmospheres - Potential Applications for Mining

    By Fairhurst RM

    High pressure abrasive water jets have been shown capable of cutting a wide range of materials including steel, stone, rock and concrete. Acceptable performance can be achieved using relatively low pr

    Jan 1, 1985

  • AUSIMM
    Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage

    Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ

    Jan 1, 2003

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    "A Geometallurgical Proxy for Nickel Laterite Heap Leaching"

    By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman

    "Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long

    Jun 15, 2016

  • AUSIMM
    Some Practical Problems in Running Statistically Valid Plant Trials, and Their Solution

    Operating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ

    Jan 1, 2008

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    Bubble Flow Pattern Detection in the Water Model of a Metal Treatment Unit.

    By Zhao JC, Chen JJJ

    A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a g

    Jan 1, 1995

  • AUSIMM
    JKSimFloat - A Tool for Flotation Modelling

    By R D. Morri, D J. Alexander

    The design and optimisation of mineral flotation circuits is currently performed using a combination of laboratory, pilot plant and full scale testing. Owing to the variable nature of flotation circui

    Jan 1, 1998

  • AUSIMM
    Preliminary 3D geological model and structural analysis of the Neoarchean to Palaeoproterozoic Hamersley Basin, Pilbara, Western Australia

    By D McB Martin, A Piechocka, M Jessell, M Lindsay, E Ramanaidou

    The Hamersley Basin of Western Australia, approximately 500 km long by 200 km wide, is recognised globally for its rich endowment of iron ore resources. Two types of bedded iron ore mineralisation are

    Nov 8, 2021

  • AUSIMM
    Upgrading Low-grade Gold Ore Stockpiles by Preconcentration Using Ore Sorting – an Assessment of the Economic Impact and Viability

    By A N. Parry, G van Wyk

    "Sensor based automatic ore sorting technologies are used in the minerals industries to efficiently remove waste and submarginal grade material from crushed and screened run-of-mine (ROM) ore, produci

    Oct 10, 2016

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    Machine learning in resource geology – why data quality is critical

    By P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Consultants in the mining industry have the opportunity to visit interesting deposits all over the world. Each deposit has its own set of challenges to face when it comes to defining and understanding

    Mar 22, 2022

  • AUSIMM
    The Sealing , Re-Opening, and Recovery of Aberdare North Colliery, N.S.W., Following the Occurrence of a Spontaneous Heating

    By Sneddon N

    In November, 1975, Aberdare North colliery was sealed at the surface to extinguish an open fire underground.The fire had developed from a spontaneous heating in one of the open goaf areas of the mine.

    Jan 1, 1978

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    The Colorimetric Determination of Vanadium in Soils, Sediments, and Rocks for Use in Geochemical Exploration

    Samples weighing 0·5 g are fused with sodium hydrogen sulphate, leached with 5 ml. of 4 M nitric acid and diluted to 10 ml. with water. An aliquot of the clear solution is boiled with concentrate

    Jan 1, 1971

  • AUSIMM
    Development of an Aquatic Habitat and Water Resource in Closing Out the Enterprise Pit

    By Fawcett M

    Pine Creek Goldfields Limited (PCG) is rehabilitating the Enterprise Pit to an aquatic habitat and potential water resource. This paper discusses the development and implementation of that plan. Pin

    Jan 1, 1994

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023