Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blasting Logistics at Rio Tinto Coal Australia's Hail Creek Mine

    In March 2003, Rio Tinto Coal AustraliaÆs (RTCA) new Hail Creek open cut coal mine commenced operations in the Bowen Basin. Hail Creek is a two-seam strip mining operation utilising two 90 m3 dragline

    Jan 1, 2007

  • AUSIMM
    Evaporation and Salt Transport Under Variable Climatic Conditions

    By T Baumgartl, B Richards

    The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i

    Jul 10, 2012

  • AUSIMM
    Laboratory evaluation of ventilation effects on the self-heatingincubation behaviour of high volatile bituminous coals

    By B Beamish

    The concept of a ‘critical velocity zone’ in the longwall goaf environment for the development of a spontaneous combustion event has been supported by numerical modelling. However, there is no experim

    Oct 12, 2022

  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    Fire Behaviour in Buffel Grass Dominated Mine Site Rehabilitation in Central Queensland, Australia

    By A Sturgess, P McKenna, P D. Erskine, D Doley, V C. Glenn

    For more than four decades, rehabilitated lands in the Bowen Basin have been planted with buffel grass (Cenchrus Ciliaris), which is often used to provide rapid, stabilising and erosion reducing cover

    Jun 28, 2016

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Blasthole Density Logging as an Aid to Blast Pattern Design

    By Bulters J, Sheppard I

    Two blasthole density logging programmes have been conducted on the Mt Whaleback iron ore mine to evaluate the use of this type of logging as an aid to blast pattern design. The first programme al

    Jan 1, 1986

  • AUSIMM
    Dependence of Flame Front Speed on Iron Ore Sintering Conditions

    By J Zhao, C E. Loo

    The flame front is a narrow region in the iron ore sintering bed where coke particles combust. The maximum flame front temperature is as high as 1400°C. At high temperatures, the sinter mix compo

    Jul 13, 2015

  • AUSIMM
    Mine Fill Research And Investigations At Rit's Division Of Mining

    After a short presentation of the Division of Mining at the Royal Insti- tute of Technology, Stockholm, Sweden, the author presents some of-the fill research carried out at the Division. Literatur

    Jan 1, 1973

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    Real Time Mine Management Systems - Delivering Value Adding Information to the Mining Workplace

    The Macquarie Dictionary defines `information' as: knowledge communicated or received concerning some fact or circumstance; (in communicating theory): a quantitative measure of the contents of

    Jan 1, 1995

  • AUSIMM
    The Tonkolili Iron Ore Deposits, Sierra Leone

    By M S. Reston

    The Tonkolili banded iron formations (BIF), Sierra Leone, host extensive iron ore deposits which are of economic signifi cance to the seaborne iron ore trade. The deposits are dominated by a strategic

    Jul 11, 2011

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • AUSIMM
    Geology and Discovery of the Que River and Hellyer Polymetallic Sulphide Ore Bodies Tasmania

    The Que River and Hellyer polymetallic massive sulphide ore bodies are located 3 kilometres apart in the Cambrian Mount Read volcanics of Western Tasmania. Both deposits are classic examples of the

    Jan 1, 1988

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Gold Mineralisation at the Muyup Prospect, East Kalimantan, Indonesia

    Epithermal gold mineralisation was discovered at the Muyup prospect during regional reconnaissance exploration in 1986. Further exploration utilising routine techniques of stream sediment, panconcen

    Jan 1, 1991

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs

    By Gordon DM

    SUMMARY Tyres account for 25-30% of the operating costs of large capacity haul units as used in open-cut mines. Tyre operating costs can be substanti- ally reduced and often contained in real terms

    Jan 1, 1982

  • AUSIMM
    A New Method for Coal Pillar Design

    A failure criterion for coal is proposed in which a distinction is made between brittle and "pseudo-ductile" failure. This criterion is then used in the development of new equations for coal pillar

    Jan 1, 1986