Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Yallourn North Extension Open Cut Interim Rehabilitation

    By Pilkington T, Noy A

    The Yallourn North Extension (YNX) open cut mine ceased mining operations in early 1989. YNX may be used again for coal supply at the discretion of the Coal Corporation Of Victoria (CCV); this has res

    Jan 1, 1992

  • AUSIMM
    Distribution of Assay Values in Some Western Australian Gold Ores

    In gold ores, the range of value disclosed by ordinary mine sampling is very wide, and the number of 'samples required for a reliable average is correspondingly great. Even where a large number o

    Jan 1, 1950

  • AUSIMM
    Numerical Modelling of Monorail Support Requirements in Decline Development

    This paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins

    Dec 6, 2010

  • AUSIMM
    Deluge System Operating Effectiveness in Road Tunnels and Impacts on Operating Policy

    By A Purchase, C Stacey

    The procedure for operation of deluge systems installed in road tunnels is still a subject of debate. The work undertaken in this paper assists in the understanding of the effects of deluge in road tu

    Jan 1, 2008

  • AUSIMM
    Dynamic Shocks in Mine Hoisting Systems

    Dynamic shocks, which occur in mine hoisting systems have been measured by various investigators over the past 30 years. In 1966 the most intensive analytical investigations were being planned in B

    Jan 1, 1971

  • AUSIMM
    Ball Mill Circuit Optimisation at Mount Isa Lead/Zinc Concentrator for Grinding Cost Reduction

    By P Allum

    This paper presents a case study to reduce the operational cost on the secondary ball mill circuit in the Lead/Zinc Concentrator at Mount Isa Mines. The circuit includes two five-metre diameter ball m

    Jan 1, 2002

  • AUSIMM
    PITOPTIM: A New High Speed Network Flow Technique for Optimum Pit Design Facilitating Rapid Sensitivity Analysis

    By Carras S, Kelsey P, Caccetta L

    An important problem in open pit mine planning is that of detennining the optimum ultimate pit limits of the mine. These limits are that contour which is the result of extracting the volume of materia

    Jan 1, 1991

  • AUSIMM
    Static Testing of Shotcrete

    By A G. Thompson, E Villaescusa, D Howard

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of full-scale ground support elements (Morton et al, 2007). The test facility consists of several stiff st

    Jan 1, 2008

  • AUSIMM
    Carbothermic Reduction of Iron Oxide and Coal Composite in Packed Bed Combustion Process

    By T Kitajima, T Kawaguchi, T Nakamura

    Carbothermic reduction of iron oxide is an attractive mechanism to produce metallic iron, since it can directly utilise coal as both reductant and fuel. To improve energy efficiency and productivity o

    Jan 1, 2000

  • AUSIMM
    Open Issues in Tunnel Boring Machine Excavation of Deep Tunnels

    By G Barla

    In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h

    Mar 8, 2011

  • AUSIMM
    REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaning

    By E Bouchard March, F Lavoie, B Legare, K Bourassa

    Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca

    Nov 8, 2021

  • AUSIMM
    Isasmelt - A 250 000 TPA Copper Smelting Furnace

    MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ

    Jan 1, 1998

  • AUSIMM
    New perspectives in iron ore flotation – from fundamental studies to on-site pilot testing

    By L O. Filippov, A Piçarra, I V. Filippova, N P. Lima, K Silva

    The reverse cationic flotation using the starch as depressor of iron oxides is the most efficient upgrading process when is applied to the simple systems composed by hematite/magnetite and quartz. The

    Aug 24, 2022

  • AUSIMM
    Electrical conductivity measurement of CaO-Al2O3-CaF2 slags by van der Pauw-Ohta Method

    By K Nakashima, K Aya, T Sumita, N Saito

    Electro slag remelting (ESR) is one of the methods used to produce high-cleanliness steel. In the ESR method, the product steel electrode is immersed in flux, and the electrode is melted by the Joule

    Jun 19, 2024

  • AUSIMM
    Developments in Explosive SupplierûCustomer Relationships

    The original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta

    Jan 1, 2004

  • AUSIMM
    Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine

    By B Ganesia, H Sahupala

    PT Freeport Indonesia is a copper-gold mine operation located in West Papua, Indonesia about 3500 km east of Jakarta. Current ore production is about 270 000 tpd, of which 30 000 tpd comes from underg

    Jan 1, 2002

  • AUSIMM
    Never Touch a Running System - Longwall Cutting Sequences and their Potential

    The optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre

    Dec 6, 2010

  • AUSIMM
    TQM Principles at Work at Nickol Bay Quarry - A Case Study

    By Marton A

    The Readymix Group have a Quarry Improvement Program - 'Building in Quality (BIQ) which has many parallels to the ICI Explosives' total quality management - 'Quality Improvement Progr

    Jan 1, 1994

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950

  • AUSIMM
    Development of a Parametric Estuarine Model for Gippsland Resource Planning

    By McLean E. J

    Background The resources of the Gippsland Basin include not only the coal and oil for which it is well known, but also the tourism resource and the quality of life which it offers its residents and

    Jan 1, 1992