Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Thermodynamic modelling of species distribution in AlCl3:BMIC salts

    By M K. Nahian, R G. Reddy

    The thermodynamic model for species distribution in aluminium chloride (AlCl3) and 1-butyl-3- methylimidazolium chloride (BMIC) system was developed. The experimental thermodynamic data, considering a

    Aug 21, 2024

  • AUSIMM
    Analysis of Slurry Sampling Arrangements at a Froth Flotation Plant

    By P Minkkinen, J Lohilahti, T Korpela, B McPherson

    Concentrator plants intake the ore from the mine and produce concentrates by extracting valuable minerals in a succession of process steps. Controlling the extraction process and detecting changes in

    Jul 29, 2014

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Assessing corrosion of reinforcement on a large scale

    By N Power, R Hassell, E Jones

    Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels

    Nov 29, 2022

  • AUSIMM
    Open Pit Mine Production Scheduling

    By Giannini L, Kelsey P

    A fundamental problem in mine planning is the determination of the production schedules over the life of the mine. The objective is to maximise profit in terms of the net present value without trans

    Jan 1, 1998

  • AUSIMM
    A Three Dimensional Kinematic Model of Muckpile Formation in Bench Blasting

    By Kavetsy A

    In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits this is largely independent of the fragment size dis- tribution

    Jan 1, 1988

  • AUSIMM
    Ballymoney Lignite Deposit

    This paper presents an overview of the strategy adopted to bring the Ballymoney opencut lignite deposit to an advanced stage of mine design and confidence. Certain aspects of the project differentia

    Jan 1, 1989

  • AUSIMM
    Recent Operation at Harima Works

    By Kadoya H, Kondo Y

    The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and th

    Jan 1, 1993

  • AUSIMM
    Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal

    By M Byrne, P Newman, M Lindqvist

    SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss

    Jan 1, 1998

  • AUSIMM
    Preparation of Iron Oxide Feed Stock for Pig Iron/Sponge Iron Production - Role of NMDC

    By Sahoo K. C

    Traditionally, the blast furnace (BF) has maintained a dominant position as the primary source of iron units. Notwithstanding the efficient nature of the process in respect of its material and energ

    Jan 1, 1999

  • AUSIMM
    Correlation between high temperature sintering characteristics and sintering behaviours of iron ore fines

    By Y X. Xue, J Pan, D Q. Zhu

    In order to reveal the correlation between the fundamental sintering characteristics of iron ores and their real sintering behaviours, a comprehensive evaluation index is proposed based on the measure

    Jul 24, 2017

  • AUSIMM
    Handling and Transportation of Industrial Minerals with Special Focus on Shipping and Distribution in North America

    I would like to thank The Australasian Institute of Mining and Metallurgy for inviting us to share with you some of our experiences in the handling, storage, and transportation of industrial minera

    Jan 1, 1989

  • AUSIMM
    Safety of a Tailings Storage Facility against Dam Instability

    By D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli

    Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case

    Jul 27, 2015

  • AUSIMM
    Ambuklao Tunnel Plug Construction

    By B Hayes

    The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956

    Mar 8, 2011

  • AUSIMM
    Twenty-Five Years of Mine Filling: Developments and Directions (b390a014-dbd9-4431-8acc-7b7e158ab629)

    The sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part

    Jan 1, 1998

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006