Coal Drift Construction by Tunnel Boring MachineBy D Sibthorpe
The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com
Sep 17, 2014
-
HORIZONTAL - A Matrix-Independent Generic Sampling StandardWe outline a first version of an ambitious goal: The world's first horizontal (matrix-independent) generic sampling standard. The specific needs and requirements are overwhelming, as all the worl
Mar 1, 2010
-
Estimation of bubble size distribution and local turbulence in a bubbly flow systemBy P Ireland, S Mitra, G Evans, A Wang, M M. Hoque
This work presents an experimental study of flow dynamics in a bubble column system (crosssection: 100 mm × 100 mm) using a non-intrusive optical technique with targeted application in a novel REFLUX™
Aug 24, 2022
-
Microwave heating behaviour of ores and its application to high-power microwave assisted comminution and ore sortingBy X Tian, J Forster, A Olmsted, E R. Bobicki, M Goldbaum, D Boucher, C A. Pickles
As the global demand for metal values expands, it becomes increasingly important to create more sustainable mining operations. Consequently, considerable research and technology development is require
Aug 24, 2022
-
What Project Managers must Demand from an Economic Evaluation!By P Card
Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de
May 24, 2012
-
Mine rockfall and rock wall failures – proven digital laser-based approach for monitoring slopes at the Kanmantoo Copper MineBy J Herrmann, J Richards, B Hutchison
An extensive trial of laser-based survey and monitoring systems at Hillgrove Resources Kanmantoo Copper Mine in the Adelaide Hills, South Australia, has proved the capabilities of the system in monito
Nov 30, 2018
-
Explosives in Underground Mining - The Light at the End of the TunnelBy MJ SMITH
For the past 150 years, drilling and blasting has been an integral part of the underground mining industry in Australia. Ever since Busby's Bore was developed using black powder to supply Sydne
Jan 1, 1992
-
Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in IndiaBy I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew
"Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application
Nov 5, 2014
-
Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1By N Clarke, J Hunt, A Barros, L Keeney
The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and
Nov 10, 2020
-
Quantification of Drill Hole Deviation – Century Mine Case StudyBy C D. Pocock
Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to
Nov 8, 2011
-
Fluid Bed Roasting at Mount ISABy Casley G. E, Pritchard J
A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15
Jan 1, 1974
-
The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground CrusherThe low grade Mount Charlotte orebody was first mined with minimum capital expenditure by mechanised cut and fill stoping. The lower block was prepared simultaneously for open stoping by shaft sink
Jan 1, 1973
-
Backfill Technology Development at Xstrata Mount Isa Mines Between 1995 and 2005By L Neindorf
The development and application of paste fill, cement slurry aggregate fill and shotcrete bulkheads at Mount Isa Mines is described. The progressive changes in filling style in the Mount Isa copper mi
Jan 1, 2005
-
High shear rotor trials in the Mount Isa Mines Copper ConcentratorBy H Law, M Muller
Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b
Aug 29, 2018
-
Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored ShaftsBy R M. Stephenson
Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi
Mar 24, 2014
-
Sulfur loss from the slag during desulfurisation of liquid steelBy S Karosiya, A Sharma, M Jain, N N. Viswanathan, M M. Pande, D Kumar, S Kumar
Desulfurisation of steel during ladle refining is governed by both thermodynamics and kinetics. For effective desulfurisation, thermodynamically, a low partial pressure of oxygen at the steel-slag int
Aug 21, 2024
-
Development of the production optimiser through collaboration between Evolution Mining and MinnovareBy C McCracken, R Landers, B Hesse
Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to
Mar 15, 2021
-
Trucking into the Next MillenniumFor the past 40 years, underground trucking using diesel powered or electric wheel driven vehicles, either conversions of surface trucks, or purpose built, has been the preferred means of ore and wast
Jan 1, 1998
-
The Decision of Stationarity in Modern Resource EstimationBy B J. Wilde
Evaluating the resources and reserves in a mineral deposit requires many interdependent subjective decisions. The decision of stationarity is arguably the most important. This decision includes: the
Sep 26, 2011
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016