Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Research on Dust Control for High Production Longwall Mining in Australia

    By Lama RD

    The paper outlines the development in the control of dust in Australia over the last 20 years. Factors influencing dust make at the faces are discussed. The effect of high production systems is an

    Jan 1, 1988

  • AUSIMM
    The Proton Precession Magnetometer as a Prospecting Instrument

    By Haigh J. E

    An accurate measure of the earth's magnetic field can be made in a few seconds with the portable proton precession magnetometer. Such an instrument increases the applicability of the long success

    Jan 1, 1963

  • AUSIMM
    The Control of Instantaneous Outbursts at Metropolitan Colliery, N.S.W.

    By Hindmarsh J. W, McCoy A. E R

    Instantaneous outbursts of coal and gas have occurred at various times in several working districts of Metropolitan Colliery, N.S.W.They have occurred in headings only, under both hand and mechanised

    Jan 1, 1964

  • AUSIMM
    Geochemical Reaction Path Modelling of a Potentially Acid Forming Waste Rock ù Effects of Framboidal Pyrite

    By R Smart

    This paper examines the longer-term predictive capacity of the GAMSPATH computer program (developed by the Alberta Research Council) for a waste rock (sample MS) obtained from the Kaltim Prima Coal (K

    Jan 1, 2003

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    Safety at home – this is where mine safety starts

    By K Biegaj

    During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20

    May 5, 2022

  • AUSIMM
    Final Pit Wall Stability ù Understanding Crest Loss Mechanisms and Possible Solutions to Block Movement

    By K McSweeney, A Marton

    This paper discusses the development of a strategy for ensuring long-term geotechnical stability of final pit walls at AngloGold AustraliaÆs Sunrise Dam Gold Mine. The strategy makes use of improved b

    Jan 1, 2004

  • AUSIMM
    On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance

    By D Morgan, K Jones

    "In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co

    Oct 10, 2016

  • AUSIMM
    Proposed workflows for portable X-ray fluorescence and near infrared instruments for soil and drill hole sampling

    By N H. Jansen, H L. Bridgwater

    Field portable X-ray fluorescence (XRF) and near infrared (NIR) instruments are proven technologies in the minerals industry. The in-field results of these instruments can add value early in the proje

    May 9, 2017

  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014

  • AUSIMM
    Sampling and blending in geoenvironmental campaigns – current practice and future opportunities

    By A Parbhakar-Fox, S C. Dominy

    The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact

    May 9, 2017

  • AUSIMM
    Mount Isa Copper Mines ù Role of the Mining Engineer

    By B J. Andrew, M R. Daley

    Mount Isa Copper Mines is a world-class mining operation producing approximately six million tonnes of ore per annum. With over 50 years of mining history and over 76 million tonnes of underground res

    Jan 1, 2005

  • AUSIMM
    The Decoppering of Lead, Tin, and Bismuth by Stirring with Elemental Sulphur

    Experimental investigations were made into the decoppering of lead, tin, and bismuth using a technique which approximates on the small scale to industrial practice.Decoppering lead with sulphur alone

    Jan 1, 1971

  • AUSIMM
    A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century Mine

    By R Wynn, N Stoitis, R A. Lauten, H Liang

    At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a

    Sep 1, 2014

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    The role of steelmaking desulfurisation and EAF-smelter in hydrogenbased steelmaking route of low-grade iron ores

    By Q Fan

    The steelmaking desulfurisation plays an important role in coal-based steelmaking route of blast furnace and BOF converter within the flow sheet of BF-deS-BOF. With the advent of H2-based ironmaking a

    Sep 18, 2023

  • AUSIMM
    Better Prediction of Performance of a Slope Using Time-series Monitoring Data at Multiple Points in a Multistep Excavation

    By L M. Zhang, X Y. Li

    Surface displacements are routinely monitored at multiple points during slope excavation. The monitoring data reveals the safety status of the slope under current loading conditions. They can be used

    Nov 5, 2014

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum (c8b2fb36-9e9c-4e1a-916e-c8ad62e78d93)

    By Pigdon SP, Anderson RM

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses

    Jan 1, 1998