Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geology of Tinaroo Area, North Queensland

    The upper amphibolite-grade mctasediments of thc rinaroo area, North Queensland, form part of a regional aurcole to the large Tinaroo Batholith and are the stratigraphic equivalents of the Hodgkinson

    Jan 1, 1982

  • AUSIMM
    Chamfered backs to improve open stope stability in poor ground conditions

    By G Capes

    A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann

    Mar 29, 2023

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    The Design of Continuous Thickeners for Flocculated Materials

    By Goldney L. H

    The authors review the literature and discuss the application of methods to the design of thickeners for ilocculated metallurgical pulps. The use and evaluation of flocculents is described. Experiment

    Jan 1, 1959

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Regular Measurement Defines Upgrades on Scrubber Screens

    By R Wilson, S Luke, R Williams, B Freeburn

    "In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e

    Oct 10, 2016

  • AUSIMM
    Removal and Recovery of Thallium from Impure Lead

    By Milner E. F

    Thallium is largely volatilized during sintering in the conventional sinter/blast furnace production of lead. The new direct oxygen smelting processes will force the thallium into the bullion, nece

    Jan 1, 1989

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    Fly-In, Fly-Out Operations ù Strategies for Managing Employee Well-Being

    By J Sibbel, K Goh

    A key issue facing mine managers in remote locations in Australia and overseas is that of managing a fly-in, fly-out (FIFO) workforce. Current Australian research (Sibbel, in prep) indicates that FIFO

    Jan 1, 2006

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    High Temperature Interactivity of Iron Ores in the Cohesive Zone of the Blast Furnace

    By X L. Liu, W Huang, J M. Zhu, S L. Wu

    The shape, position and thickness of the cohesive zone have a great influence on the operational performance of the blast furnace. Many researchers have found that the high temperature properties of i

    Jul 13, 2015

  • AUSIMM
    Industrial Sustainability, Soils and Systems Design

    In the pursuit of commercial solutions for environmental issues, individual problems are often identified, considered and resolved in isolation from other environmental matters and always at the end o

    Jan 1, 2006

  • AUSIMM
    Planning for an Integrated Dump Leach and CIP Operation at Mt Gibson Gold Mine

    By Moylan T, Stewart D

    A case study examining the procedures and financial benefits of introducing dump leaching to augment the Mt Gibson Gold Project CIP operations is discussed. Metallurgical testwork, followed by pilot

    Jan 1, 1992

  • AUSIMM
    Study of prevention methods for stress corrosion cracking in underground coalmines

    By A Crosky, S Saydam, H Chen, H L. Ramandi

    Cable bolts and rock bolts are used as primary and secondary anchoring systems in many underground mines. Reports on the premature failure of cable bolts and rock bolts due to stress corrosion crackin

    Nov 29, 2022

  • AUSIMM
    A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel Design

    By A Smith

    Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro

    Mar 8, 2011

  • AUSIMM
    Geostatistical analyses of cone penetration testing data of a tailings storage facility in a semi‐arid setting

    By P Chapman, B Moosapoor

    The objective of this paper is to present the potential applications of geostatistical analyses in planning CPTu investigations, as well as interpolation of CPTu data. The paper presents a case study

    Jul 1, 2021

  • AUSIMM
    Predicting Variations in Mill Feed

    By P McCarthy

    The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction

    Aug 8, 2011

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    The Application of Automated Samplers in Copper/Nickel Processing

    By J E. Powalisz

    "The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass

    Jul 29, 2014