Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of Innovative, Eco-Friendly and Economic Technologies for Wealth Processing at Hindustan Zinc Limited, Visakhapatnam

    Hindustan Zinc Limited (HZL) is one of the leading base metal producers in India. It operates a two-smelter Complex at Visakhapatnam, Andhra Pradesh. At this zinc-lead smelter zinc is manufactured by

    Jan 1, 2000

  • AUSIMM
    The Hematite Ores of Mount Tom Price and Mount Whaleback, Hamersley Iron Province

    The ore deposits investigated are composed primarily of hcmatite and can be grouped into three categories depending on the amount of leaching of silica and carbonate which has occurred from the origin

    Jan 1, 1971

  • AUSIMM
    Kinetics of Reduction of Arsenic(V) to Arsenic(III) with Sulphur Dioxide in Aqueous Solution

    By Lawson F

    The Australasian Institute of Mining and Metallurgy is a society of engineers and scientists formed in 1893 (incorporated by Royal Charter in 1955) to advance science and engineering in the mineral

    Jan 1, 1989

  • AUSIMM
    Risk Based Water Management ù Practical Application for Serious Management

    By J L. Merritt

    Effective minesite water management requires that this issue be treated as a risk management exercise. The management process is generally far from simple and by necessity must involve a range of pers

    Jan 1, 2003

  • AUSIMM
    Advances in Copper Anode Reverberatory Furnace Practice

    At Copper Refineries Pty. Ltd., Townsville, two reverberatory furnaces of 420 tonnes capacity are used to melt 210000 tonnes/year of copper for subsequent anode casting. When the refinery commenced pr

    Jan 1, 1977

  • AUSIMM
    Notes on the Estimation of Zinc by Ferro-Cyanide in Acid Solutions

    THE alkaline method for the estimation of zinc cannot, in the writer's opinion, be relied. upon to within very narrow limits between two assayers on unknown quantities of zinc. The end point is n

    Jan 1, 1911

  • AUSIMM
    Application of Conveyors for Underground Haulage

    The selection of the ore haulage system is one of the most crucial decisions made in the development of an underground mining project. The haulage system is, once selected, one of the components of a

    Jan 1, 2005

  • AUSIMM
    Pilot Study on Blast Movement Monitoring at Geita Gold Mine

    By F Mwijage

    "The benefits of measuring blast movement to reduce ore loss and dilution have been recognised by many people for many years and various methods have been used with limited success. Geita Gold Mine is

    Mar 26, 2012

  • AUSIMM
    Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

    The purpose of the Lower Lea Valley Cable Tunnel project is to relocate the overhead power lines circuits, which currently cross the proposed site for the 2012 London Olympics in East London. This was

    Jan 1, 2008

  • AUSIMM
    The Mercury Content of Gold in Mesozoic Vein Deposits, Otago, New Zealand

    By D Craw

    Previous studies of alluvial gold in Otago and Southland placer deposits have suggested a gold-mercury association for some deposits derived from Caples Terrane schist, whereas alluvial deposits on To

    Jan 1, 2003

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991

  • AUSIMM
    The Parker Centre ù Leading Hydrometallurgy R&D

    The AJ Parker Cooperative Research Centre for Hydrometallurgy is the focus of a world-class effort in providing technical solutions to the minerals industry. The 85 FTE staff are drawn from the Centre

    Jan 1, 2003

  • AUSIMM
    Water for a Sustainable Minerals Industry ù A Review

    This paper summarises the results of a study carried out for the Sustainable Minerals Institute, University of Queensland, aimed at identifying the major water-related issues facing the minerals indus

    Jan 1, 2003

  • AUSIMM
    A Modified Laboratory Concentrating Table

    Small scale' table concentration tests have many critics. Many metallurgists consider that such tests are of problematical value because of the difficulties involved in conducting and interpretin

    Jan 1, 1954

  • AUSIMM
    High Pressure Filtration of Fine Practice Slurries

    Using normal low pressure filtration methods for the dewatering of fine china clays, the best that can be achieved is cakes with about 30% moisture. In order to get the moisture levels down to acce

    Jan 1, 1989

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Adaptive and Intelligent Control of Cone Crushers

    By Bearman R. A, Parkin R. M

    In the comminution industry cone crushers are widely used for secondary and subsequent stages of size reduction. Traditionally cone crushers have been operated and monitored manually. Alteration of

    Jan 1, 1995

  • AUSIMM
    Residual Aeolian Placers - A New Style of Gold Deposit in New Zealand

    Residual aeolian placers (RAPs) are formed by the wind, by preferential entrainment and removal of small and low-density detritusfrom a pre-existing, typically sedimentary sequence containing heavy mi

    Jan 1, 2004

  • AUSIMM
    The Production of Nuclear Grade Uranium Dioxide Powders From Australian Ores (7b2536c4-12d9-4a3b-abac-9212e2d5236f)

    Most types of nuclear power reactors use uranium dioxide fuel. Power reactors using natural uranium dioxide fuel are of special interest to countries such as Australia that have their own uranium supp

    Jan 1, 1970

  • AUSIMM
    Control of the Flotation Rate of Carbonaceous Material in Mount Isa Chalcopyrite Ore

    When the mining and milling of 1100 copper orebody commenced at Mount Isa a satisfactory grade of copper concentrate was difficult to produce. The major concentrate contaminants were fine pyrite and s

    Jan 1, 1971