Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Marketable Resources of Australian Coal

    Coal is a very versatile resource, having variable characteristics and having potential for a wide variety of mar- kets. Australia has extensive deposits of black coal, although they are concentrated

    Jan 1, 1975

  • AUSIMM
    Full-Scale Testing of the PCF Rock Excavation Method

    A small-charge rock excavation method based upon the Penetrating Cone Fracture (PCF) technique has been demonstrated to be capable of excavating the hardest of rocks. The PCF technique involves drilli

    Jan 1, 1993

  • AUSIMM
    Fatigue Resistant Design and Repair of Dynamically Loaded Structures

    By Scales PJ

    Fatigue is the primary cause of failure of structural and mechanical components subject to dynamic loading. Recognition of this basic fact and the development of appropriate techniques and details

    Jan 1, 1982

  • AUSIMM
    Migration of Gold During Boring

    The following data cover a phase in the systematic testing of gold deposits which does not appear to have been specificalIy investigated.In boring either secondary or primary deposits, gold, by virtue

    Jan 1, 1950

  • AUSIMM
    A Comparison of Methods for Mine Tailings Sterilisation

    By E Ferrow, R Herbert, M E. Malmstr, M Fuchs

    The study of microbial sulfide oxidation and oxidation rates of tailings requires the use of sterile control samples in laboratory experiments for comparison purposes. The need for sterile tailings sa

    Jan 1, 2003

  • AUSIMM
    The e-Mine

    By K Gilliland

    The past decade has seen the widespread implementation of computerised real-time operational management systems in open pit mines. While these systems have made a significant impact on operational eff

    Jan 1, 2000

  • AUSIMM
    Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central Queensland

    By T Laurencont

    The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham

    Jan 1, 2003

  • AUSIMM
    State Batteries and The Prospector

    The object of this talk is to bring before members the importance of the prospector and the' State Battery system to the wealth and prosperity of the mining industry in particular and the State o

    Jan 1, 1941

  • AUSIMM
    The Geita and Kukuluma Mineralised Trends, Lake Victoria Goldfield, Tanzania ù Orebody Characteristics and Project Planning

    By M Skead, H Michael, R Chase, A Davidson

    Ashanti Goldfields CompanyÆs (AshantiÆs) most recent development is the Geita Project in the Lake Victoria Goldfield of NW Tanzania. It comprises six distinct gold deposits within two mineralised tren

    Jan 1, 2000

  • AUSIMM
    Lessons from the S11D Truckless Mining Project

    By T Atchison

    The Vale Ferro Carajßs S11D project in northern Brazil is based on the movement of unprecedented volumes of waste and ore for mobile in-pit crushing and conveying or ætrucklessÆ systems. In peak years

    Aug 12, 2013

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • AUSIMM
    Fusion of molten phase R&D into the metallurgical industry to drive circularity

    By S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows

    The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability

    Aug 21, 2024

  • AUSIMM
    Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens

    By J Wheeler

    The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an

    Aug 8, 2011

  • AUSIMM
    A Comprehensive Dynamic Model of the Pierce-Smith Copper Converter: A First Step Towards Better Converter-Aisle Operation

    By I T. Cameron

    The commercial production of copper metal involves a sequence of purification stages. One step of this process eliminates bulk quantities of iron and sulphur from matte Cu2S(FeS to produce blister con

    Jan 1, 1998

  • AUSIMM
    Hydraulic Fracturing as a Cave Inducement Technique at Northparkes Mines

    By R G. Jeffrey

    The Northparkes, Endeavour 26 orebody is a porphyry copperûgold deposit and comprises a moderately to well jointed rock mass characterised by gypsum veining, the intensity of which decreases with dept

    Jan 1, 2000

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • AUSIMM
    Production of Submicron Particles by Autogenous Grinding with a Stirred Mill

    By Sano S, Ishikawa T, Nagaoka H, Hayashi Y, Hasegawa M

    The stirred mill is regarded as one of the most efficient devices for micronising materials and has come to be actively used for preparation of fine particles. Recently, the demand for ultrafine par

    Jan 1, 1993

  • AUSIMM
    Tube bundle analyser flow rate, why it is important

    By M Tsai

    Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa

    Oct 12, 2022

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022