Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Assessment of main factors contributing to the height of fracturing above longwall panels – a review and case-based numerical studyBy M W. Chen, I Canbulat, S Saydam, C G. Zhang
The height of fracturing (HoF) measures the propagation distance of continuous fracturing from the mining horizon and is also termed the height of cracking (Hebblewhite, 2020; Khanal et al, 2019) or h
Nov 29, 2022
-
Development of a Resource Reliability Rating (RRR) System for Mineral Deposit Evaluation and ClassificationBy S C. Dominy
Current and proposed methods of resource classification relate to the geological, economic and technical confidence in the estimated resource. Geological confidence is, however, only vaguely defined.
Jan 1, 2002
-
Water Management Issues for Mining Proposals at the Environmental Impact Assessment StageAn Environmental Impact Statement (EIS) for a major mining development typically has to address various aspects of surface water management, including some which generally tend to be the more contenti
Jan 1, 2003
-
Development of a Process Flow Sheet for Beneficiation of Indian Banded Haematite Quartz (BHQ) Iron OreBy B S. S Rao, S Chandra
IndiaÆs iron ore mining industry is growing rapidly in order to augment the capacity to meet the unprecedented demand for the iron ore. Traditionally, much of Indian iron ore production came from expl
Jan 1, 2007
-
Kicking the Bucket - A Case Study of Evolving Domains and Geological Modelling, Sunrise Dam Gold Mine, Western AustraliaBy F Clark, B Catto
The Mako domain comprises the Mako lodes at Sunrise Dam Gold Mine, Western Australia. This domain was initially bulk or æbucketÆ domained for the open pit resource in 2000, due to complexity in defini
Jan 1, 2009
-
The Effect of Viscosity Modifiers on Gold Adsorption on Activated CarbonsBy Linge H. G
The effect of sodium pyrophosphate and several polyacrylate deflocculants (Freevis 502, 528, 529 and 532; and Maxfloc 1015) on the gold loading on Calgon GRC22 and Norit R035l5 carbons was tested and
Jan 1, 1990
-
Cannington Paste Fill System - Achieving Demand CapacityBy M Revell
The paste fill system at BHP CanningtonÆs underground silver-lead-zinc mine is described. The first of its type in Australia, the paste fill system has been operational since December 1997. Key techni
Jan 1, 2000
-
Anatomy of a Heating and Assessment of Critical Self-Heating ParametersNumerical modelling is a valuable tool for simulating the fundamental processes that take place during a heating. The models presented in this paper have enabled a quantitative assessment of the effec
Jan 1, 2005
-
Australian Regulation of Mining Companies--Capital Raising, Due Diligence, Continuous Disclosure and Related IssuesFollowing the `Poseidon boom' of the early-1970s, there was pressure for development of a national body of company law and for the introduction and development of legislation to regulate the secu
Jan 1, 1997
-
The Origin and Evolution of Australian Coal and Notes on Classification and RankINDEX OF CONTENTSIntroduction.Systems of classification of coals.RankClassification of Australian coals.Defects of systems in use in other countries.Indexing by Fuel Ratio.Classification by Ultimate C
Jan 1, 1948
-
An Investigation into a Water Inflow at Wongawilli Colliery, Southern Coalfield, New South WalesBy Poole GR
An unusually high flow of water from an oxtr.iction panel in Wongawilli Colliery pr,;npted the investigation of the possible sources of the water. It is more probable that water is derived f r,m s
Jan 1, 1986
-
Making GIS Work Like CIS (Colliery Information System)Spatial data processing using geographic information systems produces qualitative results which are superior to those from other existing software tools. However, the answers to various quantitative
Jan 1, 1995
-
Mobile Miner MM130 - A Mining InnovationThe Mobile Miner MM130 (Figure 1) is designed to tunnel or mine in hard rock. It has a 4.1 m diameter cutterhead mounted on a horizontal axis which in turn is perpendicular to the line of the machine.
Jan 1, 1993
-
The Development of a CADD Mine Design SystemBy Gill L. F, Gleeson HB
This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available
Jan 1, 1989
-
Optimising the Usage of Magnetite at a Modern Coal Preparation PlantBy Hoban M, Smith CJ
Norwich Park Mine commenced production of export coking coal in November 1979. Attention to consumables control was limited during the early running of the plant. Once higher than anticipated magne
Jan 1, 1978
-
Overview on the Development of Zinc-Based Metal Matrix CompositesBy Dionne S, Goodwin F. E
Zinc-aluminium alloy cast matrix composites have been made by squeeze casting, pressure infiltration, spraying forming and stir casting. The overview describes composites made . with these processes
Jan 1, 1993
-
Inspectorial Aspects of Roof Support During Pillar ExtractionStatistics show that despite a low lost-time accident rate there is a high fatality rate from falls of ground in pillar extraction work. Investigation of accidents indicates that in many cases the pl
Jan 1, 1974
-
Alternative Access, Mining and Hoisting for Underground DepositsIt is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam
Jan 1, 2000
-
Evaluation of Underground Coal Mine Communication and Tracking SystemsBy C Harwood
Underground coal mines in the United States are in the process of completing installations for tracking and communication systems, mandated by Congress after a number of recent coal mine disasters. Ye
Nov 22, 2011
-
Integrated Industry Relevant Research Initiatives to Support Geometallurgical Mapping and ModellingBy S Walters
The emerging discipline of ‘geometallurgy’ is not new but is becoming increasingly recognised as a discrete and high-value activity. Geometallurgy involves a quantified and spatially constrained appro
Sep 5, 2011