Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Flow investigation of multiphase manganese slagsBy V Rimal, d M. Tangstad
Multiphase slags form the basis of the reduction pathway for manganese ferroalloy production. The present work aims to understand the flow of slag through the coke bed based on experimentation in cont
Aug 21, 2024
-
Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration ModelsThe Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re
Jan 1, 2004
-
Wallaby - The Horizontally Challenged OpportunityBarrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme
Jan 1, 2008
-
Infrared Spectroscopic Drill Core Logging - Making Inroads to Deposit Scale 3D MineralogyBy A Hacket, M Haest, I Vitins
Infrared spectroscopy has the ability to accurately measure mineralogy of drill cores, allowing for better spatial characterisation of iron ore deposits and potentially improving the prediction of key
Aug 12, 2013
-
Union Reefs: A Project Assessment and Development Case HistoryBy Giles D, Wegmann D
The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.
Jan 1, 1994
-
Jaguar Raisebore design using LiDAR for back analysisBy R P. Varden
This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi
Mar 15, 2021
-
Effect of carbon on the sintering kinetics of a single hematite pelletBy García B., Wolff E.
The pellet qualities primarily depend upon the thermal profile and gaseous environment during induration. During the induration of the pellet, it undergoes physical as well as chemical changes. Physic
Jun 17, 2024
-
The Roy Hill ProjectBy J M. F Clout
The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20
Jul 11, 2011
-
Localised Indicator KrigingBy I Douglas, L Allen
Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm
Sep 26, 2011
-
Explosibility Limits - Establishing Criteria for Mine Re-EntryBy D Cliff
"Recent underground coal mine incidents have again raised the issue of: under what circumstanceis it safe for personnel to re-enter the mine? Mine rescue guidelines make recommendations aboutthe limit
Jun 1, 2012
-
The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NTBy Hein K. A A
The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.
Jan 1, 1994
-
QPM hematite by-product as an ironmaking feed materialBy G Reynolds, L Lu
Queensland Pacific Metals (QPM) is developing its flagship Townsville Energy Chemicals Hub (TECH) facility to produce nickel and cobalt sulfates from imported high-grade nickel laterite ore for nickel
Sep 18, 2023
-
Geological Reserves - Cut-Off GradesThis is a philosophical paper. it discusses some of the concepts underlying the estimation of geological reserves and the determination of cut-off grades. It explores how they interrelate and how they
Jan 1, 1990
-
Computer aided core logging at Pasminco Broken HillThe geologists at the Zinc Mine in Broken Hill have developed a method of logging core using portable MS-DOS computers and LOTUS 123. The computer based logging system has almost halved both the time
Jan 1, 1990
-
Autogenous Grinding at CobarThe design of the grinding section is discussed and details are given of the equipment installed for the autogenous grinding of ores from the C.S.A. mine at Cobar.The first section of the concentrator
Jan 1, 1969
-
Coal Geology - Where to From Here?By Hanna P
Coal geologists are under pressure to minimise exploration expenditure, maximise interpretation confidence and produce the results often too soon. This pressure continues to increase as companies are
Jan 1, 1998
-
Development of Lancefield Panel StopingA combination of highly structured, fissile stope hangingwalls and high ground stresses have caused difficult mining conditions in the Main Lode Deeps at Lancefield Gold Mine. Cyclic reviews of grou
Jan 1, 1995
-
The Application of SimulationTechnology to Enchance Operator PerformanceBy Morrison RD, Peberdy NJ
Simulator training provides a cost effective method of training operators in both the process and control aspects of a metallurgical plant. The components and requirements of a training simulator ar
Jan 1, 1991
-
Optimising Land for Beneficial Use During and After MiningBy J Purandare, D Murdoch
The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev
Jun 28, 2016
-
Capital and Operating Cost Eestimation for Open Pit Mining EquipmentBackground information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c
Jan 1, 1990