Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flow investigation of multiphase manganese slags

    By V Rimal, d M. Tangstad

    Multiphase slags form the basis of the reduction pathway for manganese ferroalloy production. The present work aims to understand the flow of slag through the coke bed based on experimentation in cont

    Aug 21, 2024

  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    Wallaby - The Horizontally Challenged Opportunity

    Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme

    Jan 1, 2008

  • AUSIMM
    Infrared Spectroscopic Drill Core Logging - Making Inroads to Deposit Scale 3D Mineralogy

    By A Hacket, M Haest, I Vitins

    Infrared spectroscopy has the ability to accurately measure mineralogy of drill cores, allowing for better spatial characterisation of iron ore deposits and potentially improving the prediction of key

    Aug 12, 2013

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AUSIMM
    Effect of carbon on the sintering kinetics of a single hematite pellet

    By García B., Wolff E.

    The pellet qualities primarily depend upon the thermal profile and gaseous environment during induration. During the induration of the pellet, it undergoes physical as well as chemical changes. Physic

    Jun 17, 2024

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Localised Indicator Kriging

    By I Douglas, L Allen

    Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm

    Sep 26, 2011

  • AUSIMM
    Explosibility Limits - Establishing Criteria for Mine Re-Entry

    By D Cliff

    "Recent underground coal mine incidents have again raised the issue of: under what circumstanceis it safe for personnel to re-enter the mine? Mine rescue guidelines make recommendations aboutthe limit

    Jun 1, 2012

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    QPM hematite by-product as an ironmaking feed material

    By G Reynolds, L Lu

    Queensland Pacific Metals (QPM) is developing its flagship Townsville Energy Chemicals Hub (TECH) facility to produce nickel and cobalt sulfates from imported high-grade nickel laterite ore for nickel

    Sep 18, 2023

  • AUSIMM
    Geological Reserves - Cut-Off Grades

    This is a philosophical paper. it discusses some of the concepts underlying the estimation of geological reserves and the determination of cut-off grades. It explores how they interrelate and how they

    Jan 1, 1990

  • AUSIMM
    Computer aided core logging at Pasminco Broken Hill

    The geologists at the Zinc Mine in Broken Hill have developed a method of logging core using portable MS-DOS computers and LOTUS 123. The computer based logging system has almost halved both the time

    Jan 1, 1990

  • AUSIMM
    Autogenous Grinding at Cobar

    The design of the grinding section is discussed and details are given of the equipment installed for the autogenous grinding of ores from the C.S.A. mine at Cobar.The first section of the concentrator

    Jan 1, 1969

  • AUSIMM
    Coal Geology - Where to From Here?

    By Hanna P

    Coal geologists are under pressure to minimise exploration expenditure, maximise interpretation confidence and produce the results often too soon. This pressure continues to increase as companies are

    Jan 1, 1998

  • AUSIMM
    Development of Lancefield Panel Stoping

    A combination of highly structured, fissile stope hangingwalls and high ground stresses have caused difficult mining conditions in the Main Lode Deeps at Lancefield Gold Mine. Cyclic reviews of grou

    Jan 1, 1995

  • AUSIMM
    The Application of SimulationTechnology to Enchance Operator Performance

    By Morrison RD, Peberdy NJ

    Simulator training provides a cost effective method of training operators in both the process and control aspects of a metallurgical plant. The components and requirements of a training simulator ar

    Jan 1, 1991

  • AUSIMM
    Optimising Land for Beneficial Use During and After Mining

    By J Purandare, D Murdoch

    The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev

    Jun 28, 2016

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990