Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Alternative Systems for Low Temperature Aftercooling

    The ongoing need for improved fuel economy, longer engine life, reduced emissions and greater power output has driven the need for lower charge air temperatures. Cuamins will introduce a split loo

    Jan 1, 1986

  • AUSIMM
    Quantifying the Influence of EmployeesÆWork-Life Balance on Organisational Productivity

    By B J. Fallon

    This study used structural equation modelling (SEM) to develop a series of models to explain the impact of work-life balance on employeesÆ perceptions of job performance, job satisfaction, turnover in

    Jan 1, 2005

  • AUSIMM
    Sizing of Fine Coal with a Compound Cylinder-Cyclone System

    By Restarick CJ

    A compound cylinder-cyclone system, fitted with a flow control valve between the cylinder and cyclone, has been used for coal slurry sizing experiments in the range approximately 100 to 300 microm

    Jan 1, 1984

  • AUSIMM
    Joint Industry Planning Platforms for Coal Export Supply Chains

    By Seeley D, Buckley N, Goodall J

    Improving the performance and reducing the costs associated with export logistics chains is critical to the competitiveness of export coal mines. The fundamental practices associated with the use of e

    Jan 1, 1998

  • AUSIMM
    Pisces-a Symbol for the Future

    By King MN, Travis IC

    PISCES - the Planning and Information System for Coal Export Services has been developed by Port Waratah Coal Services (PWCS) to ensure the efficient and economic operation of the Hunter Valley Co

    Jan 1, 1987

  • AUSIMM
    The Extraction of Gold from Bioleached Pyrite using Novel Thiourea Leaching Technology

    By Moritz P

    Thiourea has been recognised for a long time as an acid-stable complexant for gold. Generally, the use of thiourea has been shown to exhibit enhanced leaching kinetics compared to cyanide but suffer

    Jan 1, 1991

  • AUSIMM
    Three Dimensional Shape Measuring by Scanning of Ultrasonic Range Finder

    By Higuchi K

    For the mechanisation or automation of mining, recognition of the shape of mined cavities is basic information. A three dimensional shape measuring system, developed and tested, includes an ultrasonic

    Jan 1, 1991

  • AUSIMM
    The Commercial Evaluation of Coal Properties

    In preparation of this Paper, the emphasis has been laid on the commercial rather than on the technical and scientific aspects of coal evaluation. It is intended to describe and comment on the princi

    Jan 1, 1975

  • AUSIMM
    Horizontal Overburn Blast at Ulan Coal Mines

    By Tucker A. J

    An overburden blast utilising horizontal blast holes was successfully attempted at the Ulan Coal Mines during December 1991. The blast reduced operational problems and costs and improved dragline prod

    Jan 1, 1992

  • AUSIMM
    New Shotcreting for Ground Support of TBM Tunnelling

    By Takeuchi T, Matsugaki K

    We have developed a new shotcreting which is suitable for the primary support of TBM tun- nelling in soft rock. This spraying compound is made from cement, a special accelerating agent and glass fib

    Jan 1, 1987

  • AUSIMM
    Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast

    By Kleine T. H

    Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b

    Jan 1, 1992

  • AUSIMM
    TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut

    In the future to excavate sufficient coal for power generation, two dredgers would be required to dig overburden or interseam 70010 of the time and three dredgers 40010 of the time. One overburden

    Jan 1, 1989

  • AUSIMM
    Mining Practice at Cleveland Tin N.L. Tasmania

    A mechanised sub-level overhead benching method is used at Cleveland, to produce 22,000 tons per month of ore assaying 0.92% Sn and 0.40% Cu. The ore occurs in a series of vertical lenses which can b

    Jan 1, 1970

  • AUSIMM
    A Review of Tower Milling at Hellyer

    By Anderson RJ

    Tower Mills are used at Aberfoyle's newly commissioned Hellyer base metal sulphide concentrator. Hellyer ore is particularly fine grained. To achieve adequate liberation fine grinding is necess

    Jan 1, 1991

  • AUSIMM
    The Geology and Development of The Farm Fanning Gold Deposit

    By Houtgraaf M

    The Far Fanning gold deposit is situated 60 kilometres south-west of Townsville (Fig. 1). Previous recorded production is 3756 tonnes returning about 1600 ounces of gold. This has been taken from surf

    Jan 1, 1986

  • AUSIMM
    Centrifugal and Positive Displacement Pumping of Titanomagnetite Ironsand (The AuslMM Annual Conference Rotorua New Zealand)

    By Hustwick I

    New Zealand Steel Mining Limited operates two independent sand mining operations on the West Coast of the North Island of New Zealand. (Fig. 1)Waikato North Head 30km south of Auckland supplies ironsa

    Jan 1, 1990

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    New Methods for the Control of Autogenous Grinding Circuit

    By Jamsa-Jouneia SL, Lahteenmaki S

    Sophisticated control systems require sufficient and reliable information from the process to be controlled. At the Pyhasalmi concentrator two novel measurements, a particle size indicator (PSI) and

    Jan 1, 1993

  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004