    "Predicting Cu Species Classification Using Geochemistry at the Productora Cu-Au-Mo Deposit, Chile"

    By R Berry, A Escolme

    "Predictive geometallurgical models are being developed for the Productora Cu-Au-Mo deposit based on geochemistry to reflect variability in Cu species based on Cu sequential leach data (ie oxide, tran

    Jun 15, 2016

  • AUSIMM
    Development of Design Criteria for Upgradeable Friction Hoists

    Future depth and production limitations of an ore hoisting system are fixed by its initial design criteria. There is little scope to extend these limitations once installation is completed. Depth and

    Jan 1, 2005

  • AUSIMM
    Recovery of Berryllia from Beryl

    By Lawrie DC

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash andheating at 900¦C for,4-6, hours.The sintered material was then crushed and leached by boiling under reflux with 5N su

    Jan 1, 1963

  • AUSIMM
    The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism

    The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism

    Sep 13, 2010

  • AUSIMM
    Installations of the Computer at Mount Isa

    Mount Isa Mines Limited first installed electronic data processing equipment in 1959. The decision to replace this equipment with a computer was motivated by the need for greater processing power and

    Jan 1, 1968

  • AUSIMM
    Practical Problems in Chemical Control of Flotation

    By Woodcock JT

    Successful chemical control of flotation requires practical solutions to many problems. A brief discussion is first given of those para- meters which can be controlled and those which it would be d

    Jan 1, 1978

  • AUSIMM
    Carbon kiln selection, operation and maintenance

    By J K. Claflin, S R. La Brooy, A M. Claflin

    Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad

    Aug 29, 2018

  • AUSIMM
    The Control of Rotary Vacuum Filters in a Gold Recovery Plant

    By Peverett N. F

    The purpose of filtration in a gold reco- very plant is to separate the gold bearing liquid from the solids in the slurry. Some of the gold is inevitably lost due to incomplete separation. An inves

    Jan 1, 1977

  • AUSIMM
    Kinetics of Reclamation of E-Waste by a Bioleaching Route

    Kinetics of Reclamation of E-Waste by a Bioleaching Route

    Sep 13, 2010

  • AUSIMM
    Cemented Fill Practice and Research at Mount Isa

    This paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and s

    Jan 1, 1980

  • AUSIMM
    Unlock potential opportunities through unexplored aspects of Grade Engineering

    By P Revell, G Wilkie, P Walters, L Keeney, F Faramarzi

    Grade Engineering® is a value-driven strategy aiming to maximise benefits by exploiting intrinsic grade variability of ore deposits. It utilises a multitude of separation techniques to remove low grad

    Nov 10, 2020

  • AUSIMM
    The Integration of a Due Diligence Process into a Mining Operation

    A mining operation can be identified as demonstrating prudent management when a number of vital characteristics are evident.All risks and opportunities that are critical to the on-going success of the

    Jan 1, 1998

  • AUSIMM
    Predicting Iron Ore Losses and Dilution Factors Using Conditional Simulations

    By D Roldpo, M Vidigal, J F. C L Costa

    The local cumulative distribution function (lcdf) of a selective mine unit (SMU) can be estimated by conditional simulations using the statistics derived from the sample points, generating multiple eq

    Jan 1, 2009

  • AUSIMM
    A Framework for Presenting and Benchmarking Resource Projects

    By M A. Noppé

    "Investors and other stakeholders assessing the risk, opportunity and relative value associated with a resource project need to appreciate the project in its correct context. Errors, omissions, biased

    Mar 8, 2016

  • AUSIMM
    A geotechnical risk assessment tool for underground mine drives

    By H Esterhuizen, W Hartman

    Rockfalls or significant deterioration of mine openings can have significant safety and financial impacts for mining operations. The failure of drives in underground mines sometimes highlight deficien

    Nov 30, 2018

  • AUSIMM
    Land Use Geoscience – Protecting Western Australia’s Titanium-Zircon Resources for Future Extraction

    By C D. Strickland

    Western Australia (WA) has been a significant world producer of titanium minerals (rutile, ilmenite and leucoxene) and zircon for over 55 years. In 2010, despite global difficulties, WA accounted for&

    Oct 5, 2011

  • AUSIMM
    Understanding the causes of dilution in narrow vein stopes

    By S Thomas, S Ricketts, R Hassell

    Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d

    Mar 15, 2021

  • AUSIMM
    Challenges of Quality Management in Sampling and Measurement of Geometallurgical Variables

    The prime objective of geometallurgy is to improve the profitability of mines through the use of spatial models of rock properties that have a significant impact on value. Although a key property is t

    Mar 1, 2010

  • AUSIMM
    Simulation of Damage Zones Induced by Destress Blasting

    By H S. Mitri, A Sainoki

    Destress blasting techniques have been widely employed in underground mines for the purpose of preconditioning highly stressed rock mass. Appropriate applications of the technique successfully contrib

    Aug 24, 2015

  • AUSIMM
    Commissioning and Operating an Autogeneous Mill at Karowe Diamond Mine

    By N A. Sikwa, L M. van Niekerk, G N. Ndlovu

    In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first

    Jul 15, 2013