Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Why I don’t believe in reconciliation
By S Dunham
For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m
May 24, 2023
-
Resource and Reserve category inflation – known rewards, hidden risks
By M Bond, R R. Hargreaves, G W. Booth
There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio
May 24, 2023
-
Schrödinger’s kittens – lifting the lid on resource drill hole data after mining
By D Corley, J Moore, M Grant, A, W R
Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d
May 24, 2023
-
Modelling metal recovery by co-kriging the feed and concentrate masses of metal
By P Dowd, A Adeli, C Xu, X Emery
Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining
May 24, 2023
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques
By J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
An evolution of drill hole spacing studies at Newmont Corporation
By A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023
-
Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit
By D Clarke, I Minniakhmetov
The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho
May 24, 2023
-
Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)
By M P. Murphy, C M. D Barton
When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t
May 24, 2023
-
Application of three lines model in resource and reserve estimation and reporting
By D Hope, D K. Mukhopadhyay, J D. Harvey
South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang
May 24, 2023
-
Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)
By G Zhang, I Glacken
Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p
May 24, 2023
-
An estimation error
By D A. Sims
This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w
May 24, 2023
-
Improvement strategies for accurate underground drilling and blasting effectiveness at the Barrick Kibali Gold Mine
By F M. Senda
This paper highlights strategies used at the Barrick operated Kibali Gold Mine (KGM) to improve the drilling accuracy and blasting effectiveness for longhole open stoping. The mine currently uses Solo
Mar 29, 2023
-
Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution
By B Taylor
Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin
Mar 29, 2023
-
Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training
By P Oikkonen
Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and
Mar 29, 2023
-
Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story
By J P. Evert
Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod
Mar 29, 2023
-
Ground support rationalisation at Golden Grove
By R Varden
This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications
Mar 29, 2023
-
An initial review of conceptual alternative layouts for production areas in Kiirunavaara mine
By F K. Altuntov
The study presented in this paper is based on the Kiirunavaara underground mine located in the northern part of Sweden. The deposit is mined using the sublevel caving (SLC) mining method. This paper b
Mar 29, 2023
-
Construction and monitoring of development access into highly stressed rock masses
By R Talebi
A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S
Mar 29, 2023
-
Project and execution of the excavation for a haulage shaft with raise boring techniques
By M Orunesu Preiata
The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo
Mar 29, 2023
-
Planning for underground mining at Savage River Iron Ore Mine
By U Singh
This paper presents the evolution of the studies and strategic plans to extend the life of operations at the Savage River iron ore project in north-western Tasmania. The current Life-of-Mine (LOM) pla
Mar 29, 2023