    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    The Mining Cycle at Gympie Eldorado Gold Mines

    By I Levy

    At our Monkland Mine at Gympie, we operate a deep, narrow vein gold mine using hand held equipment, rail mounted haulage and narrow shafts. This is in many respects the old-fashioned way and is well s

    Jan 1, 1998

  • AUSIMM
    Statistical Analysis of Dragline Monitoring Data

    By Baafi E. Y

    Dragline monitoring systems are normally the best tool used to collect data on the machine performance and operational parameters of a dragline operation. This paper discusses results of a time stud

    Jan 1, 1998

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine

    By A J. MacDonald, M P. Raffield

    The South Deep massive orebody consists of 20 to 30 m of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 m and 3400 m. The mine design process selected a mining meth

    Jan 1, 1998

  • AUSIMM
    Artificial Neural Netword System with Hierarchic Structure to Evaluate Resource Condition of Surface Mining Areas

    By Zhang Y. D, Zhang R. X

    A new decision-making approach of artificial neural network system with hierarchic structure is presented. The fundamentals of network topology, node functions and network training are introduced. A

    Jan 1, 1998

  • AUSIMM
    The Trekelano Group of Mines - A Brief History

    The old Trekelano mining area is situated in the Cloncurry Gold and Mineral Field 14 km east-south-east of Duchess. It connected with the main Cloncurry-Dajarra railway line by a private line from Jue

    Jan 1, 1998

  • AUSIMM
    New Backfill Binder and Method

    By M Grossi, G Baiden

    This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and onsite applications. The new binder has several advantages over

    Jan 1, 1998

  • AUSIMM
    Mineralogy of Sulphide Scale Deposited in Geothermal Pipelines, Ohaaki, New Zealand

    By K L. Brown, J L. Mauk

    Sulfide-rich scale occurs in steam and water lines at the Ohaaki geothennal field,Taupo Volcanic Zone, New Zealand. Precious metals show very high concentrations around areas ofpressure reduction (Au

    Jan 1, 1998

  • AUSIMM
    Deep Paste Thickening Systems (Brisbane, 14 - 16 April1998)

    By Laros T, Schoenbrunn F

    Deep paste thickeners have been proven capable of consistently producing medium to low slump material for disposal without the need for filters. However, proper design of the entire system is critic

    Jan 1, 1998

  • AUSIMM
    A Preliminary Investigation into Electro-Strengthening of Tailings for Surface and Underground Disposal

    By Chappell B

    Backfill in the form of mine waste tailings has inherent problems associated with attaining adequate strengths upon placement. Fines are usually removed to ensure adequate drainage, which lowers the

    Jan 1, 1998

  • AUSIMM
    Drainage Research at Mount Isa Mines Limited 1992 - 1997

    By Chend J

    Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled scopes has been the primary cause of bulkhead failures and emphasis is placed on r

    Jan 1, 1998

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By Harrison AT, Smart RM

    Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two

    Jan 1, 1998

  • AUSIMM
    Design and Use of Backfill for Support in Polish Coal Mines (80b269b9-766a-4488-9ab9-f96403287b88)

    By J Palarski

    Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of

    Jan 1, 1998

  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    Recent Developments and Trends in Backfill in Canada

    By J Nantel

    Planning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless e

    Jan 1, 1998

  • AUSIMM
    Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic Bakcfill

    By Servant S

    In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the st

    Jan 1, 1998

  • AUSIMM
    The Development of Colloidal Mixer Base CRF Systems

    By A E Reschke

    The high-shear colloidal mixer is generally recognised as the most efficient method of mixing cement based grouts. Only recently however has this technology been applied to the production of cemente

    Jan 1, 1998

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill

    By Andersson PO

    Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F

    Jan 1, 1998

  • AUSIMM
    Design and Operation of Backfill for Reliable High Solids Concentration Discharge

    By A G McLean

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p

    Jan 1, 1998