Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    The Tolukuma Gold Silver-Vein System, Papua New Guinea (3cebb8ab-1142-46c7-bc74-b33c04791680)

    By Corbett GJ, Leach TM

    A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The

    Jan 1, 1995

  • AUSIMM
    Issues of Mining Equipment Automation

    This paper reviews the issues of mining machinery automation with special emphasis on underground applications. Automation is desirable because it offers the following advantages: ò increased safety

    Jan 1, 1995

  • AUSIMM
    Accreted Terranes and Porphyry Copper Deposits in the Central Andes

    The Central Andes in Peru, Chile, Bolivia, and Argentina , contain two contiguous terranes which were accreted to Gon

    Jan 1, 1995

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics - A Late Cretaceous Bimodal Association, Noumea Basin, New Caledonia

    The transgressive sedimentary sequence of the Noumea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanics of shoshonitic affinities which erupted simultaneously during t

    Jan 1, 1995

  • AUSIMM
    Long Range Planning at SEPG Twin Creeks Mine for the Sulphide Plant Study

    By Casale G

    This paper discusses a long range mine plan development at the Santa Fe Pacific Gold Twin Creeks Mine based on the reserves of Mega pit. The key constraints of the schedule development included two

    Jan 1, 1995

  • AUSIMM
    Preconditioning a Large Pillar at Mt Charlotte Mine

    By Lee M. F, Guilfoyle K

    A large hard rock rib pillar was recently preconditioned at Mt Charlotte mine using a novel blasting technique. The motivation for trialling this procedure was a history of past pillar failures, wit

    Jan 1, 1995

  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    Treasure Islands - Second Edition (802dcc80-707b-476e-bc5f-fabb6979b044)

    The Pacific Rim countries of Australia, New Zealand, Papua New Guinea, Indonesia, Fiji, Philippines and Solomon Islands will be reviewed from an equity investors perspective. The following areas will

    Jan 1, 1995

  • AUSIMM
    Pit Wall Design Implementation at Mt Whaleback Open Pit Mine, Newman, Western Australia

    By Wagland D. G, Guo H

    The Mt Whaleback orebody is in a complex geological regime. A good understanding of geological structure is essential during the design and implementation stages. The amount of information on the ro

    Jan 1, 1995

  • AUSIMM
    Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific Rim

    By J M. Totterdell

    The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early

    Jan 1, 1995

  • AUSIMM
    Bubble Flow Pattern Detection in the Water Model of a Metal Treatment Unit.

    By Zhao JC, Chen JJJ

    A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a g

    Jan 1, 1995

  • AUSIMM
    High Temperature Filtration in Soil Remediation

    By Mance G

    Today there are many different techniques of soil remediation used in Australia and throughout the world. This paper considers the thermal desorption remediation technique and, in particular, the a

    Jan 1, 1995

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • AUSIMM
    SIROFRAG -A New Technique for Post-Blast Rock Fragmentation Size Distribution Measurement

    By Cheung L. C C, Maconochie A. P

    SIROFRAG is a computer-based imaging system that quantifies the post-blast rock fragment size distribution in a muckpile in a mine environment. Improvements in blast performance and blast modelling

    Jan 1, 1995

  • AUSIMM
    Determination of the Load Applied on Support in a Buried Roadway

    By Lu S, Jiang Y

    The conventional transportation system in open pit, a to u.* itc:,~> truck., to carry the ore along the ramps. Normally, the transportation distance increases greatly as mining progresses deeper. A n

    Jan 1, 1995

  • AUSIMM
    Intragraben Fault Zones, Volcanism, and Geothermal Evolution in the Oregon-Idaho Graben, U.S.A. (cb62322a-c63b-484d-a72f-a99e158b5dcc)

    The Oregon-Idaho graben evolved after widespread Uwleiitic flood basalt volcanism associated with the arrival of the plume head of the Yellowstone hotspot beneath southeastern Oregon approximately 17

    Jan 1, 1995

  • AUSIMM
    Alluvial Platinum-Group Minerals in Southern New Zealand

    Platinum-group minerals (PGM) are recorded from a number of localities along theWaiau River, western Southland, and the south coast of the South Island, New Zealand. At each locality, small amounts of

    Jan 1, 1995

  • AUSIMM
    Mining and the Resource Management Act 1991: Is the Playing Field Level? (27291526-e767-492f-a1b1-38f146759224)

    By Brown AP

    Comparison of legal permits required for mining (as opposed to prospecting or exploration) in New Zealand, under the Mining Act 1971 and the Resource Management Act/Crown Minerals Act 1991. Mining ge

    Jan 1, 1995

  • AUSIMM
    Optimisation in Underground Mine Design

    Optimisation and sensitivity analysis of final pit limits is now an accepted procedure for open pit planning studies. Tools to assist the design engineer in an underground metalliferous mine to make

    Jan 1, 1995