Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Factors Influencing Al(III) Adsorption onto Silicate Clay Minerals

    By J. T. Liu, G. H. Han, W. C. Chai, Y. F. Huang

    "In beneficiation process, metal ions could adsorb onto clay mineral surfaces or interact with flotation chemicals, and then result in the flotation behavior changing of desired minerals. Al(III) is t

    Jan 1, 2016

  • CIM
    High-Order Spatial Simulation of the Structurally Controlled Apensu Gold Deposit, Ghana

    By D. F. Machuca-Mory

    The new algorithm for high-order simulation of ore deposit grades termed HOSIM is based on the concept of spatial cumulants. The algorithm is tested using data from Apensu, a structurally controlled g

    Jan 1, 2011

  • CIM
    Capacity Enhancement at Newmont Mining Corporation’s Twin Creeks Whole Ore Pressure Oxidation Facility

    By T. Krumins, F. C. Ruff, M. Eichhorn, L. Zunti

    Hatch Ltd. has recently completed a project to increase refractory gold ore processing capacity at Newmont Mining Corporation’s Twin Creeks facility. The objective of the project was to increase throu

    Jan 1, 2014

  • CIM
    Structural Geology Summary Of The Mcarthur River Unconformity-related Uranium Deposit, Athabasca Basin, Saskatchewan

    By S. Harvey

    The McArthur River deposit is a structurally-controlled unconformity-related uranium deposit. The mineralization is situated at the intersection of a pronounced fault zone, referred to as the P2 fault

    Jan 1, 2020

  • CIM
    Use of Numerical Methods, Scale-Up and Lab Tests in the Design of HPAL Autoclaves

    By J. Jung, W. Keller, A. Zucht

    "The agitator design for nickel high pressure acid leach autoclaves (HPAL) is critical with regard to the process result, i.e., the recovery rate. Further considerations during the design phase are th

    Jan 1, 2012

  • CIM
    High-Effective Process for the Preparation of A-Al203 Using Secondary Aluminum Dross as Raw Material

    By Qing-hua Tian, Xue-yi Guo, Fei Li

    A novel process for the preparation of a-Al2O3 from secondary aluminum dross was studied. Factors including alkali dross ratio, salt dross ratio, smelting temperature, smelting time, leaching temperat

    Jan 1, 2011

  • CIM
    The poisoning effect of H2S fuel impurities on SOFC anodes

    By Waldbillig. D.

    A baseline of the poisoning effect of hydrogen sulfide (H2S) fuel impurities on solid oxide fuel cell (SOFC) anodes was developed using polarization testing. After the baseline behaviour was character

    Jan 1, 2005

  • CIM
    Regional geochemical mapping for earth science and environmental studies

    By R. B. Barlow, J. A. C. Fortescue

    Originally developed for use in mineral exploration, regional geochemical mapping based on stream (and lake) sediment sampling is showing broader application in other areas of the earth sciences and i

    Jan 1, 1980

  • CIM
    Magnetoflotation in Nickel Ore Processing

    By Peter Wells, Adrian Sabau, Turgut Yalcin

    "The nickel ores of Sudbury contain substantial amounts of the gangue mineral pyrrhotite (Fe7S&) which causes certain diflculties in the milling of these ores. This paper proposes a process called “ma

    Jan 1, 1999

  • CIM
    Utilization of gold mill tailings as a secondary resource in the production of a high strength total tailings paste fill

    By L. M. Amaratunga, G. G. Hein, D. N. Yaschyshyn

    Fine tailings produced in the milling process have traditionally been disposed of in tailings ponds. Attempts have been made to use these fine tailings in backfill, however, to date the majority of ba

    Jan 1, 1997

  • CIM
    Feasibility study standards

    By Larry B. Smith

    "Feasibility studies are the means by which mineral reserves are established prior to financing a project. However, guidelines are generally lacking for the content, data quality and accuracy of these

    Jan 1, 2003

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015

  • CIM
    Crystallex’s Las Cristinas gold project

    By J. R. Goode

    "The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la

    Jan 1, 2005

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014

  • CIM
    Enhancement of Flow Dynamics of Existing Flotation Cells

    By Timo Niitti, Antti Rinne, Janne Turunen, Sami Grönstrand

    "This paper describes novel methods to enhance the flow dynamics of a mechanical flotation cell that can be applied to an existing installation. There are several reasons to alter the flow dynamics. T

    Jan 1, 2006

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Beneficiation and Extraction of REE from Northern Minerals’ Browns Range Heavy Rare Earth Project

    By T. Hadley, E. Catovic

    "Northern Minerals Limited’s (ASX: NTU) flagship project is the Browns Range Rare Earth Project (the Project) located in Western Australia, consisting of a number of deposits with high value, heavy ra

    Jan 1, 2014

  • CIM
    Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant

    By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank

    Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen

    Jan 1, 2014

  • CIM
    Formability Improvment for AZ31 Magnesium Alloy Rolled at Wide Range of Rolling Speed and Reductions COM 2014 - 53rd Annual Conference of Metallurgists

    By H. Utsunomiya, J. Su, K. S. Tamimi, S. Yue, M. Sanjari, L. Kestens, Hara, A. S. Kabir, R. Petrov

    Manufacturing of thin sheet is difficult in industries. Some approaches, such as small-draft multi-pass rolling, intermediate annealing, isothermal rolling and high-speed rolling were proposed to over

    Jan 1, 2014