Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Mechanical classifiers

    By F. R. Deluca

    "ClassificationClassification is a combination of mechanical and hydraulic operation which separates a pulp into two portions according to their respective settling rate. The finished product, the ove

    Jan 1, 1989

  • CIM
    Surveys at Great Bear Lake, 1931

    By Roderick C. McDonald

    Great Bear lake, the fourth largest body of water on this continent, comprises an area of approximately 12,000 square miles, and is set astride the Arctic circle, with a large portion of it witnessing

    Jan 1, 1932

  • CIM
    Hardy Mine

    By A. D. Mufch, G. P. Mitchell

    "THE HARDY MINE of Falconbridge Nickel Mines Limited is located in Lot 9, Concession 1, Levack Township, Sudbury District, Ontario, 20 miles northwest of the city of Sudbury, and a mile west of the to

    Jan 1, 1949

  • CIM
    Application of Discrete Element Method for Validating Fracture Toughness Testing of Rocks Subjected to Microwave Illumination

    By H. Nejati

    Experimentally, the Semi-Circular Bending Moment (SCB) fracture toughness test results of Basalt Specimens Under Illumination (BSUI) have shown reduction in fracture toughness and failure force as a r

    Aug 1, 2013

  • CIM
    The Application of Biologically Mediated Leaching Methods, A Comprehensive Review

    By Andrew R. Marchbank

    The application of biologically assisted methods for metal extraction in the mining industry has a long history, but development of modern techniques has been relatively slow. There is, however, a res

    May 1, 2002

  • CIM
    Optimisation of Process Parameters of Spiral Concentrator for Beneficiation of Iron Ore Stacked Slimes from Kirandul, Chattisgarh, India

    By S. K. Sharma, Sanket Bacchuwar, Prabal Kumar Agrwal, G. V. Rao

    "Iron ore processing industries play a vital role in the Indian economy. At present Iron ore of around +64% Fe is used for production of Iron through blast furnace. To produce +64% Fe from low/medium

    Jan 1, 2016

  • CIM
    Maintenance of Mining Equipment at Cassiar, B.C.

    By T L. Horsley

    The change from a seasonal to a continuous mining operation at Cassiar has been accompanied by increased emphasis on the preventive maintenance of mining equipment. This paper describes how equipment

    Jan 1, 1964

  • CIM
    The Mechanics of Waste Dump Instability on Steeply Sloping Terrain

    By Karen M. Moffitt

    Developments in mining methods and rates have led to an increase in the frequency and size of waste dump failures that have not been adequately predicted or explained in terms of conventional slope st

    May 1, 2001

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Monitoring Surface Roughness of Copper Electrodeposits Using Scaling Analysis

    By J. Keough

    During industrial electrowinning of copper, uneven growth can impact current efficiency, cause short-circuits in the cell and negatively impact the final quality of the metal product. Copper electrode

    Jan 1, 2019

  • CIM
    Underground Crusher Dust Control at Lake Shore Mine

    By O. E. Andrew

    THE object of this paper is to present a brief summary of the dust control system in use on the 3,825-foot level at the jaw crusher station, Lake Shore mine. During the years 1936 and 1937, dust surv

    Jan 1, 1941

  • CIM
    AGS - Diamond Mines

    Discovery of an economic diamond deposit produces considerable wealth in terms of jobs, royalties, mining investment, and economic spinoffs for residents, including Aboriginal peoples. Diamond mines

    May 1, 2008

  • CIM
    Mine roof bolt load determinations utilizing ultrasonic measurement systems

    By S. C. Tadolini

    "Roof bolts are the primary means of roof support in underground mines in the United States. Presently, post installation loads are measured on about 10% of the expansion anchor and combination bolts

    Jan 1, 1990

  • CIM
    Phase Evolution of ß–Al5FeSi during Recycling Al–Si–Fe Alloys by Mg Melt

    By Tong Gao, Jingyu Qin, Xiangfa Liu, Zengqiang Li, Yaoxian Zhang

    "The recycling of aluminum materials is a green industry while Al–Si–Fe is a typical scrap aluminum alloy. The key point of recycling Al–Si–Fe alloys is to separate Al and Fe. A method by introducing

    Jan 1, 2018

  • CIM
    Mine hoist braking systems

    By L. C. Galloway, G. L. Tiley

    "Mine hoist brakes must meet the following statutory performance criteria:- There should be two independent braking systems; at least one should act directly on the hoist drum.-If one brake fail s, th

    Jan 1, 1986

  • CIM
    A mobile plant for fine coal cleaning

    By M. W. Mikhail, R. J. Mikula

    "Funding has been made available through the National Energy Program to build a mobile fine coal treatment plant. The plant is intended f or field application and also to upgrade the existing pilot pl

    Jan 1, 1984

  • CIM
    Modeling and Simulation of Green Anode Formeng Process

    By H. Chaouki

    The aim of this work is to simulate the forming process of a green anode. For this purpose, a nonlinear compressible viscoelastic constitutive law is presented. The concept of natural reference config

    Jan 1, 2011

  • CIM
    The Open-Pit Mine at Asbestos Hill

    By Roméo Roussin

    "The yearly production from the Asbestos Hill pit is 1,550,000 tons of asbestos ore, with a yield varying between 18 and 20 % . The orebody was exposed at the top of a hill, and initial production sta

    Jan 1, 1976

  • CIM
    Dynamic Planning of Construction Activities Using Hybrid Simulation

    By H. Alzraiee

    Traditional planning methods such as CPM and PERT have been useful tools to manage construction projects. However, the underlying model of these traditional methods often seems to fail to represent re

    Aug 1, 2013