Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of Tailings Material for the Preparation of a Low Modulus High Density Backfill for an Operating Mine

    By Dirige. A. P. E.

    A study was conducted for an operating mine to determine the appropriateness of its tailings material to be used for the preparation of a low modulus, high density backfill. The research was initiated

    Aug 1, 2013

  • CIM
    The Canadian Power Situation With Particular Reference to Thermal-Electric Power

    By C. E. Baltzer

    This paper highlights the electric power situation in Canada, and introduces brief explanation of the salient differences between electrical practice in the United States and Canada. The availability

    Jan 1, 1958

  • CIM
    Crushing and screening circuits

    By D. W. Zandee

    "IntroductionHaving mined an economic mineral bearing rock which is of insufficient grade to warrant direct smelting, upgrading or beneficiation is required to make it an economically viable ore. The

    Jan 1, 1989

  • CIM
    Integration of Direct Flotation Reactor (DFR) Technology: From Pilot to Full-scale Operations at Barrick's Jabal Sayid Copper Concentrator

    By Fadi Layyous Gedeon, David Hatton, Solomon Mogashoa, Tuhin Banerjee, Faisal Aljohani

    The adoption of innovative technologies in mineral processing often raises concerns about complexity and integration. However, Woodgrove’s Direct Flotation Reactor (DFR) technology at Barrick’s Jabal

    May 4, 2025

  • CIM
    Mining Methods and Practices at Lake Shore

    By Leslie S. Weldon

    THE Lake Shore mine has been developed by two vertical shafts, with level intervals at 200 feet to the 2200 level and at 125 feet below this horizon. A main cross-cut joins the two shafts on all level

    Jan 1, 1936

  • CIM
    Stress-Corrosion Crack Initiation Behaviour of High-Strength Pipeline Steel in Near-Neutral pH Environment

    By G. P. Gu, B. Fang, R. W. Revie, M. Elboujdaini

    Stress-corrosion cracking (SCC) tests were conducted in the near-neutral pH standard solution, NS4, and in an actual soil solution, using four-point bending at high a stress ratio and low frequency co

    Jan 1, 2005

  • CIM
    A Risk-Based Approach to Plant Design

    By Mike Fontaine

    The success of a project is defined by meeting the financial performance objectives of the business case within a stipulated timeframe. Early in design, little information is normally available; the u

    Jan 1, 2015

  • CIM
    Operating Experiences With a Pilot Plant For the Electrowinning of Nickel From All-Chloride Electrolyte

    By L. R. Hougen

    The Falconbridge Matte Leach Process yields high-purity nickel chloride by selectively dissolving nickel from copper-nickel converter matte with hydrochloric acid , purifying the solution by solvent e

    Jan 1, 1977

  • CIM
    Overview of the Agrium Kapuskasing phosphate operation

    By R. Pressacco

    "IntroductionAgrium’s history in fertilizer production and marketing goes back to 1931. Today, Agrium Inc. is a world leader in the production, distribution, and marketing of fertilizers and related p

    Jan 1, 2001

  • CIM
    SAG Mill Operations in Sossego Mine

    By C. R. Machado

    Sossego Mine was the first Vale SAG mill operation to process copper-gold ore. It is located in the state of Para, in the south-eastern Amazon region of Brazil. In the first six years of continuous op

    Jan 1, 2012

  • CIM
    Pyrrhotite Rejection at the Strathcona Mill

    By J. Coffin, M. Muinonen, D. Fragomeni, R. Multani, C. Deredin

    "Rejection of pyrrhotite from pentlandite is of critical importance to the economics of nickel concentrate production and the main goal of the Strathcona milling operations. A joint team of XPS, Glenc

    Jan 1, 2018

  • CIM
    The Recovery of Scheelite Concentrate at Hollinger Tungsten Mill During 1942

    By John Blackshaw

    NEW sources of supply of tungsten concentrates became necessary when the flow from the Far East was blocked in 1942. In Canada, one source has been noted in the workings of the Hollinger mine at Timmi

    Jan 1, 1943

  • CIM
    In Situ Monitoring of Cemented Paste Backfill Pressure to Increase Backfilling Efficiency

    By M. W. Grabinsky, B. D. Thompson

    ABSTRACT: Use of cemented paste backfill (CPB) offers economic and environmental advantages over other backfill methods. However, many operations have limited knowledge of how their CPB behaves in sit

    Jan 1, 2011

  • CIM
    Autogenous and semi-autogenous mill circuits

    By A. K. Ratte, C. M. Brown

    "IntroductionIn autogenous mills, grinding of the ore feed is accomplished by the direct action of the variously sized rocks making up the feed on each other and the mill interior. Size reduction is a

    Jan 1, 1989

  • CIM
    Use Of Wireless Technology And Vision Systems To Improve Processes, Maintenance, And Mineral Movement In Mining Plants

    By H. Salamanca

    HighService has developed different equipment using wireless technology and machine vision systems that were specially designed to allow 1) the online determination of the SAG mills liner's servi

    Jan 1, 2007

  • CIM
    Adapting Mill Control to Account for Liner Wear on the Cadia 40ft Mill

    By Bird. M.

    As the Cadia mill was the first 40ft diameter SAG mill, commissioned in 1998, its performance, liner and discharge design attracted considerable international attention. Twelve years on, the liner des

    Jan 1, 2012

  • CIM
    Quantitative correlation of worldview to resource development conflict

    By M. Hitch, M. B. Lytle

    Resource development conflicts arise largely due to differences in worldview between those who support and those who oppose development. This paper illustrates how societies and civilizations with dif

    Jan 1, 2017

  • CIM
    Separation of Electrode Foils from Li-Ion Traction Batteries

    By Martha Gellner, Lutz Wuschke, Hans-Georg Jackel, Urs A. Peuker

    "Electric vehicles are an alternative to the existing combustion engine driven cars. According to the EU Battery Directive a substantial recycling rate of at least 50 wt.-% has to be met for aged batt

    Jan 1, 2016

  • CIM
    Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

    By C. H. Buck, A. J. Taylor

    "In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in

    Jan 1, 2018

  • CIM
    Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)

    By D. Eastick, S. Hardcastle

    "Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm

    Jan 1, 2007