Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Flin Flon Open Pit

    By M. A. Roche

    The property of the Hudson Bay Mining & Smelting Company, Limited is located at Flin Flon lake, 85 miles northwest of The Pas, Manitoba, on the Manitoba-Saskatchewan boundary. The area is at latitude

    Jan 1, 1933

  • CIM
    The testing, design, construction, and implementation of cemented rockfill (CRF) at Polaris

    By Steve Dismuke, Tom Diment

    In December 1994, Polaris decided to investigate the use of cemented rockfill (CRF) to supplement the existing frozen rockfill system. Extraction plans for the remaining ore reserves required a backfi

    Jan 1, 1996

  • CIM
    A Coupled Thermal-Fluid Flow- Multicomponent Model to Simulate the Melting/Dissolution of Solid Tial in Liquid Titanium During Electron Beam Melting

    By Ainul Akhtar, Steve Cockcroft, Daan Maijer, Carl Reilly, Lu Yao, Jun Ou

    A coupled thermal-fluid flow-multicomponent model has been developed to aid in understanding the melting/dissolution behavior of solid Al-rich Material (TiAl) in a liquid titanium pool produced by an

    Jan 1, 2014

  • CIM
    Joining of Inconel 617 Sheets Using TLP Bonding Process With Ni-Si-B Interlayer

    By R. A. L. Drew, F. Jalilian, M. Jahazi

    Joining of superalloy Inconel 61 7 with a foil interlayer using transient liquid phase bonding (TLP) technique was studied. Inconel 617 is a solid solution, Ni - Cr - Co- Mo alloy with an exceptional

    Jan 1, 2006

  • CIM
    Ceramic Composite Wear Component Usage at the Kidd Creek Concentrator

    By D. A. Garland, A. D. Jackson

    "Alanx ceramic/metal composites are proprietary products developed by Lanxide Corporation who joined with Alcan to form Alanx Products L.P. in 1988. Alanx ceramic/metal composites are composed of sili

    Jan 1, 1993

  • CIM
    Optimization of Sputtered Ti/Mo/ Au Metallization System for Solder Bonding

    By S. Akhlaghi

    In many electronic/optoelectronic devices, interaction between the metal stack and solder is undesirable. If a reaction happens, a nonuniform joint containing spikes and voids is likely to form and as

    Jan 1, 2006

  • CIM
    A Comparison of the Energy Requirements of an HPGR / Stirred Mill Circuit and Conventional Grinding Circuits for the Comminution of Mesaba Ore

    By Steve Wilson, Bern Klein, Jeff Drozdiak, Stefan Nadolski, Andrew Bamber

    "In the adaptation of high pressure grinding rolls (HPGRs) to hard-rock mining applications, circuit development has mainly focused on placing HPGRs in the role of tertiary crusher in the preparation

    Jan 1, 2010

  • CIM
    Progress in Aluminium Therapy

    By W. D. Robson

    THE prevention of silicosis by metallic aluminium has been reported by Denny, Robson, and Irwin in two papers. The first (1) was published in 1937; the second (2), in 1939. The results definitely esta

    Jan 1, 1944

  • CIM
    Algoma Uranium District

    By Franc R. Joubin, Donald H. James

    "The Algoma (or Blind River) uranium district is centred in an area of some 600 square miles on the north shore of Lake Huron, about half way between Sudbury and Sault Ste. Marie, Ontario (Figure 1).

    Jan 1, 1949

  • CIM
    Progress in Coal Mining Technology (96be6499-4406-45a3-aa5f-2bc856cde4c1)

    By A. Ignatieff

    This is the second review of developments in coal mining engineering (see C.I.M .M. Transactions, Vol. LI, 1948, pp. 262- 264) and covers the period from October, 1948, to January, 1950. Mechanizat

    Jan 1, 1950

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • CIM
    A Process for Preparing Tungstic Trioxide of High Purity from a Canadian Scheelite Concentrate

    By W. A. Gow, J. A. Vezina

    "A new process for treating scheelite for the production of tungstic tri-oxide is described. The novelty of the process resides in that an ion-ex-changer is used to convert sodium tungstate to either

    Jan 1, 1966

  • CIM
    Economic Evaluation of Biooxidation of Gold Ores

    By Jaeheon Lee

    "Biooxidation of gold ores or concentrates could be a very attractive alternative to pressure oxidation (POX) or roasting to liberate the gold grains from various sulfides. Crushed heap bioleaching wa

    Jan 1, 2016

  • CIM
    Some Factors in 'Freezing' in Naphtha-Producing Wells in Turner Valley

    By W. P. Campbell

    Foreword At the outset, it should be stated that this paper does not pretend to present a panacea for the ills that 'frozen' wells are heir to, but rather is an attempt to bring to the at

    Jan 1, 1930

  • CIM
    Supervisors - their selection and development

    By Peter Moon, Lloyd G. Campbell

    "How well supervisors supervise, and are supervised determines whether management's goals will be reached and ...how effective the work force will be... Upper management must recognize the potent

    Jan 1, 1990

  • CIM
    Diggability of plains overburden with bucketwheel excavators

    By A. M. Krzanowski, T. S. Golosinski

    "This paper presents results of a study undertaken to determinethe feasibility of mining plains overburdens with bucket wheel excavators. Based on extensive geotechnical testing of overburdens under s

    Jan 1, 1987

  • CIM
    Progressive Failure of Norite Rock Under Biaxial Loading Condition

    By Hani S. Mitri

    Strainbursts in brittle rock are common to deep underground mines. The state of stress at the boundary of mine openings is dictated by a biaxial stress/loading condition. This paper reports the result

    Apr 1, 2005

  • CIM
    Changes in the Dewatering System at Nickel Rim South

    By Bryan Wilson

    Background ?Nickel Rim South Mine started production ramp-up in Q2, 2009. ?The main dewatering pumps were put into use in August 2009. ?3 Feluwa?multisafe?positive displacement pumps ?1700m singl

    Nov 1, 2011

  • CIM
    High-Effective Process for the Preparation of A-Al203 Using Secondary Aluminum Dross as Raw Material

    By Qing-hua Tian, Xue-yi Guo, Fei Li

    A novel process for the preparation of a-Al2O3 from secondary aluminum dross was studied. Factors including alkali dross ratio, salt dross ratio, smelting temperature, smelting time, leaching temperat

    Jan 1, 2011

  • CIM
    Magnetic Prospecting Methods in Asbestos Exploration

    By John H. Low

    Introduction Despite the fact that the .association of magnetite with chrysotile asbestos in the parent producing area of the world, the Thetford Mines - Black Lake area, has been recognized since th

    Jan 1, 1951