Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Environmentally Friendly Mining Technologies in Polish Coal Mining Industries

    By J. Palarski

    Hard coal, mined in Silesia Region as well as in the eastern part of Poland, is a key national resource. In Polish underground coal industry, modern mining technologies have been successfully tested a

    Aug 1, 2013

  • CIM
    Recovery of Rare Earth Elements Adsorbed on Clay Minerals

    By V. G. Papangelakis, G. A. Moldoveanu

    "Rare earths adsorbed on clay minerals are easily recovered via ion exchange during leaching with inorganic monovalent salt solutions. The leaching efficiency of various salts at 0.5M and 25°C was inv

    Jan 1, 2012

  • CIM
    Recent Improvements at Tamano Refinery

    By M. Narita, S. Nakayama, M. Fujihara

    Hibi Kyodo Smelting Co., Ltd. was founded in 1968 and celebrated its 50th anniversary in 2018. In 1972, we started producing copper cathode with a production capacity of 84 KTPY. Since the company fou

    Jan 1, 2019

  • CIM
    Advances in Infrared Spectroscopic Sensing Towards Improvements in Geological and Geotechnical Models

    Infrared spectroscopic data collected using HyloggerTM technology is being used to assess the mineral composition of Archean iron ore bedrock and Cenozoic detrital units in Western Australia’s Pilbara

    Jan 1, 2015

  • CIM
    Management of Radioactive Wastes from Rare Earth Element Production

    By L. M. Lowe, D. B. Chambers, D. G. Feasby

    "The presence of the naturally occurring radioactive elements uranium and thorium in rare earth (RE) resources can present challenges in achieving regulatory and social acceptance. The discovery and a

    Jan 1, 2016

  • CIM
    Reduction of Water Treatment Costs through Ion Exchange Preconcentration of Metals While Maintaining Strict Effluent Standards

    By D. Sanguinetti, A. Consigny, M. Nodwell

    "Alkali precipitation of dissolved metals is an inexpensive but non-selective means of treating mine wastewater. Alternatively, sulphide precipitation can treat to below parts-per-million concentratio

    Jan 1, 2012

  • CIM
    Developing Visualized Schedules for Plant Information Modeling

    By B. Leonard

    As of November 2012, the Alberta government listed 53 oil and gas, oil sands, and mining construction projects either proposed or currently under construction. These industrial plant construction proj

    Aug 1, 2013

  • CIM
    SAG milling design trends, comparative economics, mill sizes and drives

    By M. Pfeifer, M. N. Brodie, D. J. Barratt

    "This paper reviews design trends related to the various SAG mill configuration and drive options available today. The impact of these options on capital and operating costs is assessed, and key techn

    Jan 1, 1999

  • CIM
    Some Changes in Physical Properties of Steels and Wire Rope During Fatigue Failure

    By P. E. Cavanagh

    Abstract Many investigators have been interested in developing some non-destructive method for detecting or determining the changes in physical properties in steel occurring during endurance tests

    Jan 1, 1947

  • CIM
    Integration of Intelligent Models and Sensing to Prevent Hardly Predictable Hazards in Construction Sites

    By E. Quaquero

    This article reports on the current state of an ongoing research project which is aimed at implementing intelligent models for hardly predictable hazard scenarios identification in construction sites.

    Aug 1, 2013

  • CIM
    Synthesis of a-Bromo-Saturated Fatty Acids and Their Collecting Prperties on Quartz Mineral

    By Binbin Luo, Northeastern University, Chuanyao Sun, Jie Liu, Yimin Zhu, Yanjun Li

    "A series of new type collectors a-bromo-saturated fatty acids, CH3(CH2)5CHBrCOOH (a-BHA), CH3(CH2)7CHBrCOOH (a-BDA), CH3(CH2)9CHBrCOOH (a-BLA), CH3(CH2)11CHBrCOOH (a-BMA) were synthesized from satura

    Jan 1, 2016

  • CIM
    A Projection of Future Energy and Greenhouse Gas Emissions Intensity from Copper Mining

    In this study, we develop a detailed model of the likely future carbon footprint of primary copper supply. We develop a peak copper production model, based on a detailed copper resource data set, and

    Aug 1, 2013

  • CIM
    Ferric Sulphate Precipitation at Gold Pressure Oxidation Conditions

    By W. Hawker, A. M. Ivana

    "Pressure oxidation is used to liberate gold from refractory sulphide ore and concentrates with over fifteen autoclaves in operation. Despite the importance of pressure oxidation, the autoclave chemis

    Jan 1, 2017

  • CIM
    A Comparative Analysis of Binders for Iron Ore Pelletization

    By S. Komar Kawatra, Youlian Zhou, Joseph A. Halt

    "Bentonite clay has been the most common binder for iron ore pellets. Although bentonite increases pellet strength and durability, it has several disadvantages. For example, its use increases the cost

    Jan 1, 2016

  • CIM
    Oil-Shales of Canada

    By S. C. Ells

    Within the Dominion of Canada occurrences of petro-liferous shales have been known for many years. Nevertheless, with the exception of a comparatively brief period, Canada has had to depend largely on

    Jan 1, 1925

  • CIM
    Progressive Management and Engineering Evaluation of Pipeline Integrity

    By S. Kariyawasam, R. McNealy

    Pipelines are subject to multiple threats often requiring quantification of pipeline risk and engineering evaluation of in-line inspection and other data to effect discovery of conditions defined by t

    Jan 1, 2005

  • CIM
    SPLC - A Power Supply for Smelting Furnaces

    By T. Gerritsen, C. Martinez, F. Stober, T Ma, J. R. Frias, M. Sedighy, J. Janzen

    Electrode control systems regulate power by physically positioning electrodes. Due to the weight and inertia of the electrodes and hoist equipment, this is a relatively slow process where power fluctu

    Jan 1, 2005

  • CIM
    Developments in Conveyor Belting for Mines

    By J. B. Kitchin

    "The design of conveyor belting for use in mines poses problems to the manufacturer that are unique. The challenge to be met is that of the production of a conveyor belt which can withstand use and mi

    Jan 1, 1967

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • CIM
    Retimbering No. 2 Shaft at Sigma Mines (Quebec) Limited

    By G. E. Peacock

    SIGMA MINES is situated in the township of Bourlamaque, Abitibi County, Quebec. It is a gold producer, and presently treats an average of 1,200 tons of ore per day, at a grade of approximately 0.18 oz

    Jan 1, 1962