Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit
By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson
This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t
Jan 1, 2020
-
Nexgen Energy’s Rook I Project, Southwestern Athabasca Basin, Saskatchewan: The Next Generation Of Uranium Processing And Tailings Management
By Sean Hillacre, Arthur Lieu
NexGen’s approach to uranium processing design including the crushing/grinding and leaching of raw ore through to yellowcake precipitation and tailings management focuses on minimizing surface footpri
Jan 1, 2020
-
Experimental Study On Application Of Bleed In Acid Isl
By Meifeng Zhi, Yuqing Niu, Xixin Chang, Fengqi Zhao, Weimin Qiu, Hao Wang, Zhenqian Wen, Zujun Shu
An applicable Eluex process was developed for acid in-situ leaching (ISL) uranium mine in Bayanwula. In this process, uranium was adsorbed with strong base anion resin from the pregnant solution, then
Jan 1, 2020
-
Mineralogy And Modelling – Predicting Uranium Leach Extraction At Olympic Dam
By B. Pewkliang, K. Ehrig, E. Macmillan, M. Smith, V. Liebezeit, Y. Li
The Olympic Dam iron-oxide copper-gold (IOCG) uranium-silver deposit is the largest publicly declared uranium, fifth largest copper and third largest gold resource. Currently, the operation consists o
Jan 1, 2020
-
A Model City That Made Reparations From Past Uraniummining And Milling Practices
By W. L. Dam
Grand Junction, Colorado’s legacy with uranium mining and milling serves as a model attracting international interest. Access to water and central location to carnotite ore containing uranium and vana
Jan 1, 2020
-
Nexgen Energy’s Rook I Project, Southwestern Athabasca Basin, Saskatchewan: The Next Generation Of Uranium Operations
By Troy Boisjoli
Since its discovery in February 2014, the Arrow Uranium Deposit has undergone rapid development through aggressive and systematic drilling programs and is now being progressed through advanced enginee
Jan 1, 2020
-
Orano Mining R&d And Innovation Portfolio And Deployment Methodology
By Hervé Toubon, Matthieu Davrinche, Jim Corman, Mamane Bello Boubacar Kinassa, Pierre Amadieu
Orano Mining maintains a significant level of Innovation and Development Research for its sites in Canada, Niger, Kazakhstan, Mongolia, and France. This effort is formalized within the six major thema
Jan 1, 2020
-
Predictive Modeling For In Situ Recovery Operation
By Gwenaële Petit, Ulan Massimkhanov, Gilles Joubert
For its Zuuvch Ovoo uranium deposit in Mongolia, Badrakh Energy (partly owned by Orano Mining) is working on the prefeasibility study for exploitation by ISR (in situ recovery). As part of this projec
Jan 1, 2020
-
Structural Geology Summary Of The Mcarthur River Unconformity-related Uranium Deposit, Athabasca Basin, Saskatchewan
By S. Harvey
The McArthur River deposit is a structurally-controlled unconformity-related uranium deposit. The mineralization is situated at the intersection of a pronounced fault zone, referred to as the P2 fault
Jan 1, 2020
-
Improving Uranium Processing With Membrane Systems
By Georges Croisé, Les-Lee Thompson, Adrien Debergé
Membrane filtration systems have regained focus in recent years as an effective means of liquid-liquid separation to increase the concentration of valuable elements, recover reagents or remove impurit
Jan 1, 2020
-
Development And Demonstration Of A Novel Elution Process For Chloride Tolerant Uranium Ion Exchange
By J. E. Quinn, S. Wolstencrof, K. H. Soldenhoff
Ion Exchange (IX) using Strong Base Anion Exchange (SBA) resins is conventionally used to purify uranium from sulfuric acid pregnant leach solutions (PLS), particularly when uranium grades are relativ
Jan 1, 2020
-
Recovery Of Vanadium As A By-product In The Acid And Alkaline Processing Of Uranium Ores
By K. E. Prince, S. Burling, R. J. Ring, M. K. Maley, W. R. Taylor
Vanadium occurs as a component of carnotite, which commonly occurs in calcrete type ores, and in association with uranium in some sandstone-hosted deposits. Increasing demand for vanadium, which is us
Jan 1, 2020
-
The Optimization Journey Of The Harmony Gold’s South Uranium Plant Operation And The Uranium Contribution To The Gold Operation As A By-product
By R. Jacobs, R. E. L. Pobe
The Moab Khotsong Metallurgical Complex comprises a gold recovery circuit (Noligwa Gold Plant) and a uranium recovery circuit (South Uranium Plant). The metallurgical complex employs the reverse leach
Jan 1, 2020
-
Nexgen Energy’s Arrow Deposit, Southwestern Athabasca Basin, Saskatchewan: A Geostatistical Approach To Deposit Development
By Troy Boisjoli, Sean Hillacre, Matt Batty
Discovered in 2014, the Arrow Uranium Deposit has undergone rapid development through successive drilling programs informed by geostatistical drill hole spacing studies. An independent third-party geo
Jan 1, 2020
-
Pugging-curing Process: Uranium Recovery Model In Orano Mining Somaïr Plant
By V. Bruned, K. Mohamed, A. Michaut
Orano Mining Somaïr uranium treatment plant (Niger) uses a pugging-curing process to leach uranium. Sulfuric acid, nitrates and water are added to the finely grinded ore in a rotary drum to leach uran
Jan 1, 2020
-
Uranium In Argentina: Resources, Demand And Perspectives For Nuclear Supply
By L. López
Argentina reported about 40,000 tonnes of uranium (tU) as reasonably assured resources and inferred resources for the production cost category <130 US$/kgU in the OECD-NEA/IAEA classification scheme.
Jan 1, 2020
-
Reducing Risk From First-of-kind In-situ Recoveryfor The Athabasca Basin
By Jared Onyirimba, Jim Viellenave, Hal Demuth, Dale Verran, Chad Sorba, Errol Lawrence, David Bronkhorst
As outlined within the Denison Mines Corp’s (“Denison”) Pre-Feasibility Study ("PFS") completed in late 2018, additional work is required to increase confidence and reduce risk associated with the app
Jan 1, 2020
-
Process Scale-up For Uranium, Mercury And Cesium Recovery From Surrogate Radioactive Cemented Waste
By A. Demers, M. Chapman, N. Reynier, R. Lastra, M. Courchesne, C. Laviolette
Historic medical isotope production at Canadian Nuclear Laboratories (CNL) in Chalk River involved the dissolution of irradiated isotope targets prior to extraction of Mo-99. This process generated li
Jan 1, 2020
-
Alkyl Arsines And U
By J. Gogal
Cameco's Cigar Lake Operation (CLO) started commercial uranium ore production in 2015. Initial mining was focused in areas of the ore body with relatively low concentrations of elements of concern (EO
Jan 1, 2020
-
Radium In Mining Effluents: Promising Water Treatment And Environmental Monitoring
By J. Schick, V. Granger
Nowadays, all French former uranium mining sites are remediated and redeveloped. If needed, mining waters containing radium have to be treated before discharged into the environment. Classical radium
Jan 1, 2020