Non-Linear Evaluation Of Pile Groups Lateral DeflectionBy F. Castelli
A simplified non-linear method to predict the behaviour of a single pile and/or pile group under horizontal loads is presented in the paper. The evaluation of the non-linear lateral deflection is base
Jan 1, 2006
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Foundation Retrofitting Using Micropiles - A Case HistoryBy Mohammad Nasim
Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a
Jan 1, 2008
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, MassachusettsBy Harry Schnabel
A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi
Jan 1, 2011
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - SummaryBy Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Shaft End Bearing Capacity In Cavernous LimestoneBy Issa S. Oweis
Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t
Jan 1, 2009
-
Micropile Foundations For Support Of New Bridge Structures Over Abandoned MineBy Timothy J. Myers
Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso
Jan 1, 2009
-
The Driven Grout Pile - An Economical Alternative In Pile Foundations ? ScopeBy Brian Langdon
The DRIVEN GROUT PILE was developed in 1989 by DeWitt Construction, Incorporated. This piling essentially consists of a cost-in-place concrete piling that reacts on a steel boot that is driven to bear
Jan 1, 1990
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case HistoryBy Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC RegionBy Frank J. Arland
Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p
Jan 1, 2004
-
Some Experience With Large Diameter Caissons ? SynopsisBy I. H. Wong
The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee
Jan 1, 2010
-
Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case StudiesBy Daniel Ruffing, Charlie Krug
In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher
-
Seattle Shored Excavation - Design, Construction, MonitoringBy David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Contractual Pitfalls To Avoid With ACIP PilesBy William Babcock
Augered, Cast-In-Place (ACIP) piles can be an economical, reliable, versatile foundation system. They have also been a part of projects that were behind schedule and the subject of lawsuits. The ACIP
Jan 1, 1997
-
Wrigley Field – The 1060 ProjectBy Darren S. Diehm
"Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad
Jan 1, 1900
-
Structural Underpinning By PinpilesBy D. A. Bruce
Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per
Jan 1, 1992
-
Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And ClaysBy Dongwook Kim
Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD
Jan 1, 2010
-
Digitalization in Reverse Circulation Drill RigsBy N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
New Technologies For Quality Control Of Augered Cast-In-Place PilesBy Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r