Pile-Supported Raft Foundation SystemBy Emre Biringen
Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
Performance Requirements For Vibrocompaction On Crushable Calcareous Sands Of The Uae And Their Verification In Comparison To Silica/Quartz SandsBy Vijaya Bhushan Rao, Jason Redgers
The typical Vibrocompaction projects undertaken in the UAE are on reclaimed Sands. These Sands which are predominantly the crushable, calcareous, carbonate sands found locally as opposed to the more c
Oct 1, 2022
-
Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration ResistanceBy Glen Mann, H. G. Vestberg, Robert D. Holtz
"Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically
Jan 1, 2005
-
Pile-Supported Raft Foundation System (fd70e68a-eb6f-470f-9fd8-5fc4c0cc8d20)By Mohab Sabry, Emre Biringen
"Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howev
Jan 1, 2017
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall BuildingBy Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction EventBy Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast LoadsBy John Mould, Gordon Chen, Michael Oakland, William McElwee
"This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
Jan 1, 2017
-
Indicator Pile Program at Port of Oakland, CaliforniaBy Partha Sircar
"For Berth 22 modifications at the Port of Oakland, nearly 600 octagonal 24-inch ‘diameter’ precast-prestressed concrete piles were driven, some piles over 160 feet long. Prior to production pile driv
Jan 1, 2015
-
Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast LoadsBy Michael Oakland
This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Economic Design Of Piling Platforms On Coarse Grained SubgradeBy Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Case History: Large Diameter Micropiles for the Highway 53 Relocation ProjectBy Nathan W. Iverson, David S. Graham, Paul J. Axtell
"The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a
Jan 1, 2017
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New ConstructionBy Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015