Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static MethodsBy Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit LimestoneBy Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Urban Challenges In Design, Co-Ordination And Construction Of Deep Foundations And Retaining WallsBy Pawan L. Sethi
Design and construction of deep foundations and basements is increasingly becoming more complex, as the density and frequency of urban development increases. This growth brings various associated chal
Nov 1, 2022
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Tapertube ™ PilesBy Alexander Filotti, Stanley Merjan
"Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge
Jan 1, 2014
-
Cyclic Axial Loading Of Offshore Piles - An Issue Of Concern?By Paul Doherty
Expansion of the global piling industry has been coupled with significant research efforts investigating the mechanisms controlling pile capacity. Static pile design has transitioned from total stress
Jan 1, 2009
-
Unique Algorithm Which Takes into Account Source Wave Travel Paths When Estimating Absorption Values From DST Data SetsBy Gerald Verbeek, Erick Baziw
Dynamic soil analysis (DSA) in geotechnical practice is intimately related to the capability of measuring the necessary soil properties of shear modulus and absorption. In DSA the methods of analysis
Jan 1, 2019
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft InteractionBy Hessam Yazdani
In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations
Jan 1, 2013
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing MethodsBy Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Professional Responsibilities In Sub-Surface Investigations For Foundations. - IntroductionBy D. J. Ketkar
It is a frequent experience to find that the Sub-surface Investigation (S.I.) data is either inadequate or misleading. However, such cases are rarely reported. Nonetheless, the projects suffer on-acco
Jan 1, 1996
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case HistoryBy Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic LoadsBy Amy B. Cerato
The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic
Jan 1, 2008
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Jet Grouting Soft Clays for Tunnelling & Deep Excavations Design & Construction IssuesBy Marcelo Chuaqui
We certainly have the data to back calculate it. I must admit that I haven't, at the moment my priority is not on what is the stiffness of the jet grout but is making sure that the jet grout is r
Feb 10, 2003
-
-
Pile Load Testing in New York CityBy Joel Moskowitz, Jan Cermak
"New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o
Jan 1, 2005