Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell InterchangeBy Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
Present To Future Design Considerations Of Deep Foundations ? 1. IntroductionBy William S. Gardner
It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac
Jan 1, 1991
-
Creative Shoring Solutions For A Tight Urban SiteBy David G. Winter
The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s
Jan 1, 2009
-
Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge ProjectBy Gray Mullins
A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade
Jan 1, 2003
-
Guidelines For The Interpretation And Analysis Of The Static Loading Test ? 1. IntroductionBy Bengt H. Fellenius
The design of pile foundations is much more commonly verified by means of a full-scale test, than is the design of other foundation units. The reason is not that our knowledge of pile behavior is more
Jan 1, 1990
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - SummaryBy Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
Repair Of Deep Foundations - SummaryBy Dennis W. Boehm
The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current
Jan 1, 1999
-
Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality ControlBy Franz-Werner Gerressen
New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su
Jan 1, 2019
-
Application of Dry Jet Mixing to Earthquake DisasterBy Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) method as the representative deep mixing technique has been demonstrating best practice on ground mitigation works coping with complicated soil condition and limited site space.
Jan 1, 2015
-
Session 30 "Grouting for Tunnels 2"By Raymond Henn
Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting
Feb 10, 2003
-
Stabilization Of Organic Soil With The Limix SystemBy Magnus Ruin
The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met
Jan 1, 2001
-
Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical GardenBy David C. Kraft
Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped
Jan 1, 2011
-
Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing BridgeBy Roy M. Schnabel
The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in
Jan 1, 1993
-
Extra Deep Cut-Off at 250 m Depth - A Case StudyBy Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - IntroductionBy Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Soft Deep Mixing for the Mitigation of Seismic RiskBy A. Flora, E. Bilotta, F. Foria, V. Nappa
"All the typical applications of deep mixing rely on the good mechanical properties of the improved columns to strengthen or stiffen the ground for a number of geotechnical applications.This paper foc
Jan 1, 2015
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Analysis and Case Study for Minimizing Differential Settlements in Piled Raft FoundationsBy Yu Chuang, Zai Jinmin, Liu Songyu
"The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti
Jan 1, 2005
-
Friction Loss in Tieback Anchors used for Landslide StabilizationBy John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho
Jan 1, 2017
-
Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design FormatBy Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022