Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression TestsBy Padmavathi V, M. Najamuddin, M. R. Madhav
Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation
Sep 1, 2022
-
Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in MalaysiaBy Chandrasegaran, Tamilmani
"This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part
Jan 1, 2015
-
Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And ClaysBy Dongwook Kim
Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD
Jan 1, 2010
-
Sonar Calipering Of Slurry Constructed Drilled Shafts - Providing Quality Assurance And Quality Control In Deep FoundationsBy Denton A. Kort
Historically the visual examination of drilled shafts to determine shape was typically done under dry conditions. Many engineers believe that by using a dry method of construction, the question of sha
Jan 1, 2007
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric ProjectBy Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews
"The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re
Jan 1, 2016
-
Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In BaltimoreBy S. Y. Fantaye
This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma
Jan 1, 2008
-
Probabilistic Development Of Load And Resistance Factor Design For Driven Pipe Piles In Sands: Lessons LearnedBy K. C. Foye
Use of load and resistance factor design (LRFD) of foundations is growing, from offshore applications to bridge applications and beyond. The development of load and resistance factors for design has
Jan 1, 2008
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
Geotechnical Assessment Of The Manhattan Cruise Terminal Piers: Analysis Of Timber Piles In Soft Organic SiltsBy Rodrigue Karam
An assessment of the geotechnical conditions at the Manhattan Cruise Terminals (Piers 88, 90, 92 & 94) was conducted after excessive settlement and structural distress was reported at Pier 92. The pie
-
Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load TestBy Scott M. Mackiewicz
This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T
Jan 1, 2008
-
The Effects Of A Direct Electrical Current On The a Value Of Metallic Piles In Clay - SynopsisBy Stephen T. Bloomer
The application of a direct current electrical potential between a metallic pile and a fine grained soil results in an almost instantaneous change in the magnitude of the forces acting on the pile.
Jan 1, 1996
-
Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee DamBy Glen R. Andersen
"Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is
Jan 1, 2017
-
Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case HistoryBy Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet
"Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat
Jan 1, 2016
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
First Use In The USA Of The CSM Method For Use As Microtunnel Sending And Receiving ShaftsBy Brett K. Mainer
In the summer and fall of 2007, Drill Tech Drilling and Shoring, Inc. designed and built three 24-foot inside diameter shafts in Northern California using soil mix panels for support. The soil mixing
Jan 1, 2008
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, CanadaBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004