Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
3D Analysis Of The Seismic Behavior Of Inclined MicropilesBy Seyyed Mehdi Radeghi Mehrjou
It is important to study structures and their retrofitting techniques in order to avoid earthquake-induced seismic damage within countries that are prone to earthquakes. Todays, micro piles are employ
Sep 1, 2022
-
Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Preserving The Foundations Of Some Of Boston?s Oldest BuildingsBy Michael J. Atwood
Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood
Jan 1, 2011
-
Design Of Concrete Tunnel Liners And Pipes By Ring Compression Theory ? SynopsisBy W. Lum
In the U.S., flexible metal pipe culverts are designed by ring compression theory because the pipes are capable of deflecting and deriving side support from surrounding ground. For economy, tunnel
Jan 1, 2010
-
Oakland Turning Basin Bulkhead Spin Fin® PileBy Todd Nottingham
Channel deepening of major ports is challenging designers to explore innovative solutions to ensure stability of bulkheads, such as for the Oakland Inner Harbor. This particular challenge was met with
Jan 1, 2008
-
Deep Excavation Retaining Systems In Unsaturated SoilsBy Tariq B. Hamid
Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav
Jan 1, 2006
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended PilesBy Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima
"The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the
Jan 1, 2017
-
Recommended Steps And Procedures For Planning And Performing A Geotechnical Investigation For A Seismic Retrofit ? IntroductionBy Mark DeSalvatore
Currently, at Caltrans, the Office of Structure Design is carrying out an extensive seismic retrofit program involving transportation structures throughout California. The goal of the retrofit program
Jan 1, 1993
-
The Effect Of Overburden On Pile Capacity In A Calcareous MarlBy William M. Camp
An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet
Jan 1, 1993
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? SynopsisBy D. Goossens
Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the
Jan 1, 1996
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 BroadwayBy Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000
-
Discussion On Base Grouted PilesBy V. M. Troughton
Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim
Jan 1, 1991
-
Caltrans Bridge Seismic Design/Retrofit Criteria ? SynopsisBy Brian Maroney
In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T
Jan 1, 1993
-
Construction Of Pile Foundation For Railway ViaductsBy M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WABy Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
The FHWA Geotechnical Program for 2017"Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w
Jan 1, 2017
-
Ground Improvement By Cement Grouting Combines With Pipe Piles In Bridge Construction - SummaryBy Peter White
A bridge reconstruction project involved driving pipe piles for the new foundations. Disturbances within soil layers at depth caused sinkholes to open up within the construction site. After a near fat
Jan 1, 1997