Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingBy Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Optimising the Compressive Behavior of Screw Piles in Sand for Marine Renewable Energy ApplicationsBy Andrew J. Brennan, Jonathan A. Knappett, Lewis Hamilton, Michael J. Brown
"Abstract This paper investigates the compressive behaviour of screw piles in sands and the key design parameters which control this. These types of foundation elements have typically been used as scr
Jan 1, 2014
-
Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
5 Pile Testing - Pile TestingBy George Goble
I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is
Jan 1, 1994
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoireBy Adrian Mercer, Ashkan Ameri
Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi
Sep 8, 2021
-
Construction of High Road Embankment over Thick Soft Silty Clay- A Case StudyBy R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Behavior of a Piled Raft in Dry Cohesionless Soil Subjected to Lateral LoadingBy Srijit Bandyopadhyay, Aniruddha Sengupta, G. R. Reddy, Raj Banerjee
The objective of the present endeavor is to compare the performance of a pile raft system in foundation sand subjected to lateral loads. To study the behavior of pile raft system in sand a laboratory
Jan 1, 2015
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Shoring And Caissons At The Air Canada Centre/Raptors StadiumBy Dawn C. Tattle
[ ] Panoramic View of Completed Facade Supports The following case history describes the installation of earth retention systems, historical facade supports and structural caissons by Anchor Shor
Jan 1, 1997
-
Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged ToesBy Chu E. Ho, Paul Napoli
This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a
Jan 1, 2019
-
"Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."By Alexander J. Verstraeten
Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de
Jan 1, 1987
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Helical Pulldown? Micropiles Support Museum Celebrating The Bicentennial Of The Lewis And Clark ExpeditionBy Roy Jennings
The Discovery Expedition of St. Charles, MO chose to build its two-story museum in the flood plain of the Missouri River, near the starting point of the Lewis and Clark Expedition. Should the lower le
Jan 1, 2003
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Design and Construction of Specialty Foundation for the Historic Virginia State Capitol BuildingBy Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Evaluation Of The Originally Published, Meyerhof Empirical Correlations Of Shaft Friction And End Bearing Capacity For Driven Piles Using Dynamic Test DataBy Karl A. Higgins
In 1976, Prof. G. G. Meyerhof published a famous article in the Journal of Geotechnical Engineering titled ?Bearing Capacity and Settlement of Pile Foundations?. This article presents the authors opi
Jan 1, 2011