Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield TerminalBy Randy R. Huberty
Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result
Jan 1, 2001
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
State of the Art Ground Improvement Technique for a Residential Complex: Case StudyBy Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan
"For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr
Jan 1, 2015
-
Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney
The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke
-
Comparison of Numerical Predictions Using P-Y Curves and Finite Element Analyses of Monopiles of Ocean Energy Converters under a Very Large Number of Low Amplitude Lateral Load CyclesBy Deepak Pappusetty, Miguel A. Pando
This study is motivated from the increased interest in recent years to explore use of Ocean Energy Converters (OEC’s).OEC’s can be tidal or generate electricity from wave or current action. Design of
Jan 1, 2015
-
Life Extension of 132 kV Lattice Tower FoundationsBy Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
ISM MICROPILE WORLD CUP 2017 WINNER - Life Extension of 132 kV Lattice Tower FoundationsBy Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, LondonBy Shields H. Arup
The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi
May 1, 2022
-
Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test VerificationBy Tracy Brettmann, Melis Sutman, C. Guney Olgen
"The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape
Jan 1, 2017
-
Harry Nice Bridge Geotechnical Instrumentation Case StudyBy Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.
Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans
Oct 1, 2022
-
Innovative Earth Retention Project for a Parking GarageBy Andreas Brandner, Karl Schoenherr-Strasse, I. B. Brandner, Dipl. Ing
"A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long bui
Jan 1, 2016
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
The Application of Rapid Load Testing In SingaporeBy Gilbert Chuah, Peter Middendorp, Joost Bakker, Soon-Hoe Chew
"The Rapid Load Testing (RLT) of foundation piles has been applied worldwide since 1984. Several International and national codes are available, such as the Japanese Code of Practice (2002), ASTM D738
Jan 1, 1900
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
Lateral Load Tests on Step Tapered Bored Piles in Calcareous SandsBy Nabil F. Ismael, Mohamed El Deeb
"The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed
Jan 1, 2005
-
Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected ApplicationsBy Michael E. Ameel
The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co
Jan 1, 2010
-
Assessment of the Durability of Cementitious Barrier MaterialsBy Stephan A. Jefferis, Adrian H. Bath
"This paper draws together some themes on the durability of barrier systems, and particularly cementitious systems. For contaminated land and water retaining structures, durability can be poorly addre
Jan 1, 2016
-
Integrity Testing of Drilled Displacement Piles at a Major CampusBy Mark D. Fuhriman, Parham Khoshkbari, Robert Fosse
Drilled displacement piles are becoming an increasingly common deep foundation choice for their relatively simple installation methods, applicability to a wide range of subsurface conditions, and vers
Sep 8, 2021
-
Active Soil Nail Wall Underpinning Solution For The Bruce Museum ProjectBy Martin B. Hudson, Andrew K. Cho, Rolff B. Knobel, Les R. Chernauskas, Jonathan L. Ernst
ABSTRACT The Bruce Museum, located in Greenwich, Connecticut, is home to an extensive display of art and natural history exhibitions. A large addition was designed to be constructed adjacent to the mu