Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Performance Of Three Unique Shoring Sections For Block 75 Shoring

    By Chris Sammon

    The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet

    Jan 1, 2010

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Tension Testing of the Grouted Anchorage Assembly for Multistrand Anchors

    By Lucian L. Bogdan

    "SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the

    Jan 1, 2005

  • DFI
    Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles

    By Norm Kirk, Robert Bittner

    "The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca

    Jan 1, 2017

  • DFI
    Underpinning Atlanta International Airport Concourse E for APM Tunnel Extension

    By Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith

    "Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access

    Jan 1, 2017

  • DFI
    Monopile Construction Technique For Mumbai Coastal Road Package 1 - Mumbai

    By T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D

    The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir

    Sep 1, 2022

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Cast Insitu Piling For The King's Wharf Project, Sydney, Australia

    By Slav Tchepak

    The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin

    Jan 1, 2000

  • DFI
    Finite Element Aided Design Method for Frozen Earth Shaft Support

    By Joseph A. Sopko

    The first documented procedures for designing frozen earth structures are over 50 years old, implemented long before the introduction of the Finite Element Method (FEM). Since that time, the developme

    Jan 1, 2019

  • DFI
    Deflection-based Design For The Capitol Crossing Support Of Excavation

    By Harald P. Ludwig, Matthew J. Niermann

    The support of excavation (SOE) for the Capitol Crossing project in Washington, DC consisted of a combination of soldier piles, lagging, tiebacks, braces, underpinning, single auger soil mixed (SASM)

  • DFI
    Development Of Design Practice For Piles In Stiff Glacial Till

    By Kenneth Gavin

    Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete

    Jan 1, 2009

  • DFI
    Simplifying the Design of Laterally Loaded Piles for Waterfront Structures

    By Amanda R. Parry, Chris R. Pray

    Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of

    Sep 8, 2021

  • DFI
    Predication Of Heave For Deep Excavation With Irregular Plane Shape

    By Zhang Jiaju

    For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method

    Jan 1, 1991

  • DFI
    Marine Foundation Retrofi t for the Richmond - San Rafael Bridge

    By Patrick E. Durnal, Henrik Dahl

    "A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the

    Jan 1, 2007

  • DFI
    Hybrid Design Approach for Anchored Retaining Walls in Complex Geology

    By Christopher J. Ramsey, Don W. Dotson

    "An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga

    Jan 1, 2015

  • DFI
  • DFI
  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • DFI
    Hybrid Excavation Support System for the Union Station Revitalization Project

    By Charles G. Crans, Naresh Gurpersaud

    "Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni

    Jan 1, 2017