Critical Evaluation of Indian Standard for the Design of Laterally Loaded PilesBy Sanket Rawat, Ravi Kant Mittal, Vikash Prasad
"The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p
Jan 1, 2017
-
Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d FeaBy Sailesh S. Author
The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using
-
Seismic Response Of Raft Foundations Supported On Aggregate PiersBy Alper Turan
The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedules
-
Assessment Of Safe Load On Piles Using Indian Standard Codeprivate ? SynopsisBy Shenbaga R. Kaniraj
The pile loading tests are generally conducted to assess the safe load on piles in compression. In the Indian practice, the safe load is determined using the pile loading test data and the two criteri
Jan 1, 1996
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
The State Of The Art Of Jet Grouting In The United StatesBy George K. Burke
Jet grouting was first introduced into North America in the late 1970's, soon after the conception of the system in Japan. However, it was not until the mid-1980's that the technique began t
Jan 1, 2002
-
Numerical Analysis of Progressive Failure of DM Columns beneath Embankment on Soft GroundBy Zhou Haizuo, Diao Yu, Zheng Gang
"The conventional design method for the embankment supported by DM columns usually assumes the simultaneous failure of all the columns. However, the progressive failure may occur in practice, especial
Jan 1, 2015
-
Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental ResultsBy Walter I. Paniagua
Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a
Jan 1, 2007
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Opimization of Solid and Hollow Micropiles for Shallow Foundations on SandBy P. D. Arumairaj, B. Vani
"Micropiles are small diameter cast insitu reinforced grouted piles and it has been effectively used in many applications of ground improvement. It increases the load carrying capacity of soil and red
Jan 1, 2015
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:By A. L. Garassino
Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside
Jan 1, 1994
-
Effects Of Permanent And Temporary Loads On Allowable Bearing Capacity Of Piles Subjected To Nagative Skin FrictionBy Mohammad T. Izadi
Piles are, often, used for transferring load from the super structure through soft consolidating strata onto relatively stiff uncompressible soils. Downward movement of the soft soil strata develops
Jan 1, 2001
-
Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)By Alper Turan, Hesham El Naggar
"The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule
Jan 1, 2017
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016