Search Documents
Search Again
Search Again
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Non-destructive Testing Of Unknown Bridge Foundation Lengths Using Parallel Seismic TestingBy Chetan D. Savani, Mike K. Muchard
The necessity to evaluate undocumented foundation lengths is essential in assessing the useable life, need for scour protection, retrofitting, or full reuse of existing bridge foundations. For this pu
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th
Jan 1, 2019
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Monopile Construction Technique For Mumbai Coastal Road Package 1 - MumbaiBy T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D
The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir
Sep 1, 2022
-
130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DSTBy Gerald Verbeek, Erick Baziw
"Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit
Jan 1, 2017
-
Prescriptive Specification Design: The Impact on Cost and Constructability – Case HistoryBy Shawna Munn, Nadir Ansari, Allison Bennett
"This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an
Jan 1, 2017
-
Engineering The Mansion's HeritageBy Ken MacLeod
A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi
Jan 1, 2006
-
Inspector's Manual For Driven Pile Foundations ? IntroductionThis manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an
Jan 1, 1997
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Route 9A Pedestrian Tunnel at the World Trade CenterBy Raymond E. Sandiford
"The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit
Jan 1, 2012
-
Analysis Of Pile Behavior In Granular Soils Using DEMBy Jeremy G. Kress
We propose the discrete element method (DEM) as a complimentary alternative to analytical solutions and FEM models for the analysis of pile response. DEM is a novel approach to the engineering design
Jan 1, 2010
-
Development of Environmental Double Pile (EDP) for Improvement of Contaminated Soft GroundBy Hyunsuk Yoon, Kiho Lee, Juhyng Lee, Younghoon Jung, Junboum Park
"The environmental double pile method is presented as a device to improve the engineering properties and to clean up contamination of low-permeability soil. This method is one of the novel technologie
Jan 1, 2005
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPTBy Md. Nafiul Haque, Murad Y. Abu-Farsakh, Chris Nickel
"This paper presents the results from a pile load testing program for a bridge construction project in Louisiana. The testing includes two 54-inch open-ended spun cast concrete cylinder piles (OECP),
Jan 1, 2017
-
Structural Aspects Of The Stabilization Of Ten Mile SlideBy Adrian Gygax, Sarah Gaib, Rod Kostaschuk
The British Columbia Ministry of Transportation and Infrastructure (Ministry) recently completed a slope stabilization project at Ten Mile Slide on Highway 99. The highway is an essential part of the
Oct 1, 2022
-
Safety And Economics Of Working Platforms – A Uk PerspectiveBy David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022