Effect of Non-Plastic Fines on Liquefaction Susceptibility of Fine SandsBy Kodi Ranga Swamy, N. Sankar, M. Akhila
"Until recently, liquefaction-related studies concentrated on clean sands believing that only sands are susceptible to liquefaction. However, a few earthquakes like 1976 Tangshan earthquake, the 1989
Jan 1, 2017
-
Bending Strength Of Threaded Micropile ConnectionsBy Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007
-
Keynote Lecture 5: Giovanni Lombardi Grouting of Rock MassesBy Giovanni Lombardi
In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep
Feb 10, 2003
-
Drilled Shaft Foundations For The KcICON Missouri River BridgeBy Paul J. Axtell
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M
Jan 1, 2009
-
Effect Of Surcharge Pressures On Excavation Support - Inconsistencies Between Design Calculations And PracticeBy Darrell Wilder
When designing excavation support systems in urban environments, it is often necessary to consider the effect of vertical surcharge loads from adjacent structures. Several methods are used in practice
Jan 1, 2006
-
Outline and Execution Control System of Dry Jet Mixing (DJM) MethodBy Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in ChicagoBy Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin
This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca
Jan 1, 2018
-
Geo-Foundations Project Information Management Systems on a BudgetBy Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Deep Soil Mixing Utilizing Multi-Auger Equipment And Procedures - General - Background InformationBy Robert Jakiel
The following paper is being presented to provide a basic understanding of the equipment and procedures used in multi-auger deep soil mixing as part of the program for the Deep Foundations Institute (
Jan 1, 2001
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
A Review Of Typical Foundations Used In The City Of Cleveland, OHBy David V. Lewin
Heavy structures in central Cleveland, Ohio, are supported on raft foundations, driven piles, or caissons. Settlements can be predicted and structures are designed to accommodate such settlements. On
Jan 1, 1985
-
Bearing Capacity Of Nodular PilesBy S. Kanai
Nodular piles is to be piles provided with several nodular projections along the pile shaft, as shown in Fig. 1. Nodular piles are usually installed through either driving method with hammer or prebor
Jan 1, 1989
-
Jobsite Safety Inspection ChecklistBy Sam Messina
[Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist
Jan 1, 1998
-
TPT Piling System - An Introduction To TPT PilesBy Stan Merjan
Composite piles with precast concrete tapered pile tips (TPT Composite Piles - U.S. and foreign patents) are a new and important addition to the piling types available to the construction industry. TP
Jan 1, 1987
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Lateral Load Tests on Step Tapered Bored Piles in Calcareous SandsBy Nabil F. Ismael, Mohamed El Deeb
"The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed
Jan 1, 2005
-
Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement ProjectBy Richard Hanke, Franz-Werner Gerressen
"The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re
Jan 1, 2015
-
Evaluation of Soil-Bentonite Backfill Consolidation PropertiesBy Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
The Berkeley Art Museum: Repurposing a Historical BuildingBy Timothy Nelson, Simon Burnworth
"The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne
Jan 1, 2016
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984