Recycling Jet Grout Backflow: Waste Mitigation and Cost BenefitsBy Craig T. Jones, Zachary Q. Maassen
"Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting
Jan 1, 2017
-
Numerical Analysis Of Load Bearing Capacity Of Drilled Shafts With DefectsBy Khamis Y. Haramy
Quality assurance and quality control of drilled shafts has become a concern due to difficulties in accurately locating construction anomalies and determining load bearing capacity of defected drilled
Jan 1, 2007
-
An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In SandBy Giuliana A. Zelada
This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature
Jan 1, 2000
-
Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2002
-
Recent Developments In The Law Of Deep FoundationsBy Brian P. Waagner
Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c
Jan 1, 2002
-
Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - IntroductionBy F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000
-
Design And Construction Of The Rion Antirion Brdoge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2005
-
Residual Loads Measurements in Driven Steel H-PilesBy Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, PaGENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA
Jan 1, 2001
-
Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational StructureBy Lawrence P. Goldfarb
The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center
Jan 1, 2009
-
Driving and Extraction of Steel Pipe Piles in Nearshore EnvironmentBy Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez
"A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br
Jan 1, 2017
-
Driving And Extraction Of Steel Pipe Piles In Nearshore EnvironmentBy Nihal Bohra
A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre
-
Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985By Donald J. Murphy
Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in
Jan 1, 1986
-
Analyses Of Dynamic Increasing Energy Load Test On Deep FoundationsBy Silvana B. Foá
Results from full-scale loading tests showed the use of the dynamic increasing energy test (DIET) to verify the capacity of deep foundations. This method allows the measurement of dynamic resistance -
Jan 1, 2002
-
Experiences From A Large Scale Driven Precast Piling Project In IndiaBy Rajesh A. Vaidya
A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere
Jan 1, 2007
-
Dynamic Centrifuge Model Tests on Pile-Type Deep Mixing Method Reducing Lateral Flow of Liquefied GroundBy Tsuda Wakaki, Naoki Takahashi, Natsuki Okuno, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"Deep mixing (DM) method has been increasingly employed as a countermeasure against subsoil liquefaction in recent years. Pile-type DM, however, is considered to have little effect as a liquefaction c
Jan 1, 2015
-
A Proposal Of Calculation Of Piled Raft FoundationsBy Andrzej Tejchman
Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M
Jan 1, 2002
-
Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? SynopsisBy T. Soejima
In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me
Jan 1, 2010
-
Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26By E. C. Demsky
This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret
Jan 1, 1989