Extra Deep Cut-Off at 250 m Depth - A Case StudyBy Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
High Capacity Rock Anchors At The Bear Mountain BridgeBy Frederick C. Rhyner
This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R
Jan 1, 2010
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
High Capacity Piles In The Hamilton Bayfront AreaBy C. D. Thompson
Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad
Jan 1, 1987
-
Diving Underground - Through a Hologram - To Better Understand Foundation RiskBy Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols
Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm
Jan 1, 2019
-
Risk Management and Ground Improvement Technologies in the Case of LiquefactionBy Sebastian Fischer, Rolf Katzenbach, Steffen Leppla
"The risk management in the case of liquefaction is one of the most serious and also difficult issues in geotechnical engineering because failure caused by liquefaction is always a sudden failure with
Jan 1, 2015
-
Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002By Colin Curtis
The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an
Jan 1, 2002
-
Deep Caisson Foundations In China ? SynopsisBy C. Y. Liu
This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca
Jan 1, 2010
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
Frequency-Variable Vibrators And Their Application To Foundation Engineering - 1 IntroductionBy K. Rainer Massarsch
In some parts of the world, vibrators are used extensively for different types of foundation engineering projects. If used correctly and in suitable soils then vibratory pile driving for example is ve
Jan 1, 1995
-
Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? SummaryBy Marius B. Wechsler
There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause
Jan 1, 1987
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - SummaryBy Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992
-
Recent Advances In Large Diameter Diaphragm Wall ShaftsBy Benoit Virollet
Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr
Jan 1, 2006
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole InspectionBy Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Approach Wall Foundations Olmsted Locks And Dam Project ? SummaryBy Jeffrey A. Schaefer
The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe
Jan 1, 2001
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014