East Boston Branch Sewer Relief Project: Support Of Excavation Case StudyBy Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Deep Foundations for Top-Down Construction of High-Rise ProjectBy Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation ConstructionBy Matthew Runion, Christopher Lawler
The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction
-
Efficient Torque-Installed Pile Use in Southern CaliforniaBy Jason Buenker, Molly Winston
Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp
Jan 1, 2019
-
Wanapum Dam Repaired Using Post-Tensioning AnchorsBy Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein
In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o
Jan 1, 2018
-
Performance Of Storage Tanks Supported By Shallow & Deep FoundationsBy Akhila Manne, Prasad P. V S R
Storage tanks are heavily loaded thin-shelled structures that exert large loads on and require large foundations to support them. They are generally very sensitive to foundation settlements as it may
Nov 1, 2022
-
Developments In Thermal Integrity Testing Practice And InterpretationBy A. Fisher
The use of thermal integrity testing to verify the quality of deep foundations has increased significantly in the UK and other world markets over the last 5 years. The introduction of distributed fibr
Oct 1, 2022
-
Load Testing MethodsThis Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa
Jan 1, 2004
-
Reliability Assessment of the Capacity of Single Pile Subjected to Vertical LoadingBy Rajarshi Pramanik, Nirjhar Dhang, Dilip K. Baidya
"This paper performs the reliability evaluation of pile foundation under vertical loading condition using the concept of fuzzy set theory. The uncertain parameters are expressed as fuzzy numbers. Mont
Jan 1, 2015
-
Session 16 "Deep Mixing Method IV"By Mary Ellen Bruce
Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only
Feb 10, 2003
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
A Unique Solution To Mitigate Movement At The Jefferson Memorial SeawallBy Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011
-
Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer ImpactBy Vivek Samu, Murthy Guddati
A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite BedrockBy Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Applications of Nondestructive Testing Methods for Mass Foundation Blocks - Feasibility StudyBy Hamed Layssi, Farid Moradi, Thomas Tingson
This paper describes the feasibility and pilot study of of using existing non-destructive testing solutions for evaluating structural integrity and mechanical performance of mass concrete foundations.
Sep 8, 2021
-
Dynamic Monitoring And Analysis Of Pile Foundation Installations ? IntroductionBy Patrick J. Hannigan
The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio
Jan 1, 1990
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Pile Foundations General - .1 Equipment informationBy Bengt H. Fellenius
.1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1
Jan 1, 1991
-
Machine Foundation RepairBy Scott D. Thomson
The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of
Jan 1, 2003