Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Railroad Bridge Approach Embankment Settlement MitigationBy Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery
Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate
Jan 1, 2018
-
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NYBy M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Design Build of the New NY Bridge FoundationsBy Leykam Chris J., Jacobs Scott. A.
"Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze
Jan 1, 2016
-
Seismic and Lateral Load Design and Testing GuidelinesBy Don Deardorff, Ke Yang, Yingcai Han, Ken Sorensen, Robert Kruger, Mark Petersen, Diane Fiorelli, Larry Goldfarb, Kathryn Petek, Kwabena Ofori-Awuah
Design of deep foundations for lateral loads requires an understanding of soil-foundation-structure response during loading. Lateral loads on a deep foundation (piles) could be due to earthquakes, win
Jan 1, 2012
-
Prescriptive Specification Design: The Impact on Cost and Constructability – Case HistoryBy Shawna Munn, Nadir Ansari, Allison Bennett
"This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an
Jan 1, 2017
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th
Jan 1, 2019
-
Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, MalaysiaBy Vijayakumar Viramuthu, Martin Heinrich
Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T
May 1, 2022
-
Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney
The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke
-
Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental ObservationsBy Andrew Budek
"Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini
Jan 1, 2005
-
Capacity of Hydraulically Jacked PilesBy Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017
-
Risk Management Techniques to Avoid LitigationBy Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell
In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur
May 1, 2022
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Uncertainties In CSL Test Interpretations And Recommendations Toward A More Efficient ProcessBy Rohrbach
Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, secan
-
Uncertainties in CSL Test Interpretations and Recommendations toward a More Efficient Process (d88ba311-8a75-4265-90f4-c083be22cd1a)By Mark A. Rohrbach, Timothy R. Kovacs, PhD Saidin
"Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, seca
Jan 1, 2017
-
Dynamic Response of Short Piles under Lateral Transient LoadBy Ambarish Ghosh, Rituparna Dey, Indrajit Chowdhury
"In port and harbor facilities, jetties and cargo berth terminals are usually installed on piles that remain partially embedded in soil, while a part of it behaves as columns supporting top deck. Tech
Jan 1, 2015
-
New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure FoundationsBy Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer
Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct
Sep 8, 2021
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017