Simbat : High Strain Dynamic Test Of PilesBy Dominique Vié
Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera
Jan 1, 2002
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction EventBy Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Comparative Analysis Between Traditional And EC7 Criteria Applied To The Design Of Diaphragm Walls Concerning The Ultimate Limit StatesBy J. Matos e Silva
The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditional crit
Jan 1, 2002
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982By Hal W. Hunt
Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng
Jan 1, 1984
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
“Value Engineering” — Four Case HistoriesBy Maral Papazian Bedian
"Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans
Jan 1, 2003
-
Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Design Of The Foundation Of Zhu Jiang Fanying High-Rise Building Complex ? SynopsisBy A. F. Deng
A general description of the project, mainly the pier foundation design of the ZHU JIANG FANYING is presented in the paper. The major contents include the foundation scheme, the evaluation of bed-rock
Jan 1, 2010
-
A Case Study Of Passive Piles Failure In Open ExcavationBy S. T. Kok
This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from
Jan 1, 2009
-
Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And SuccessesBy John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at
Jan 1, 2011
-
Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise BuildingBy A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane
Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha
Jan 1, 2019
-
Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case StudiesBy Daniel Ruffing, Charlie Krug
In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher
-
Modulus of Elasticity in Deep Bored PilesBy Carlos Lam, Joram M. Amir, Erez I. Amir
"Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta
Jan 1, 2014
-
Sheetpile Installation Vibration StudyBy Kenneth A. Pidgeon
This paper presents a case history on mitigating vibration problems associated with the installation of steel sheetpiles. The project in-cludes installation of steel sheetpiles for a utility trench wi
Jan 1, 1995
-
Effect of Non-Plastic Fines on Liquefaction Susceptibility of Fine SandsBy Kodi Ranga Swamy, N. Sankar, M. Akhila
"Until recently, liquefaction-related studies concentrated on clean sands believing that only sands are susceptible to liquefaction. However, a few earthquakes like 1976 Tangshan earthquake, the 1989
Jan 1, 2017
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container ShipsBy Bill Paparis
The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which
Jan 1, 2013