Micropiles for Seismic RetrofitsBy Rob Jameson
"Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar
Jan 1, 2009
-
Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental ConsiderationsBy Takashi Enomoto
"The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja
Jan 1, 2015
-
Estimating Axial Displacements Of Driven Piles In California SoilsBy Cem Akgüner
The displacements of axially loaded single piles are analyzed with an approach based on elasticity. Young?s modulus and Poisson?s ratio of the soil encompassing a pile are the unknowns required as in
Jan 1, 2008
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground ConditionsBy Emad Farouz, Francis A. Abreu
"This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla
Jan 1, 2017
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, CaliforniaBy Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen
"District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c
Jan 1, 2015
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
Cyclic Degradation on Wind Turbine Foundations in Cohesive SoilsBy Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu
Sep 8, 2021
-
Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey
"Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility
Jan 1, 2017
-
Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer ApproachBy Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon
"Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled
Jan 1, 2005
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Systematic Evaluation of Foundation Reuse for a Metro StationBy Haoran Zhang, Chu Ho
A recent design-build project in New York involved various degrees of additions and improvements to four existing transit stations. Reuse of the existing foundations was considered a more sustainable
Sep 8, 2021
-
Philadelphia Dock Story—Pile Challenges at Delaware RiverBy Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged ToesBy Chu E. Ho, Paul Napoli
This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a
Jan 1, 2019
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016