    A Unique Solution To Mitigate Movement At The Jefferson Memorial Seawall

    By Jesús E. Gómez

    In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North

    Jan 1, 2011

  • DFI
    Impact Of Offshore Site Investigation Practice On Reliability Of Axial Pile Design In Siliceous Sands

    By James A. Schneider

    The evolution of the American Petroleum Institute (API) design method for axial capacity of driven piles in siliceous sands is explored, and complemented with an overview of how changes in offshore si

    Jan 1, 2006

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • DFI
    Interpreting Strain Measurements From Load Tests In Bored Piles

    By Jack Hayes

    Vibrating wire strain gages have proven to be a very reliable and effective tool for the measurement of strains associated with the loading of bored piles (drilled shafts). However, when these strains

    Jan 1, 2002

  • DFI
    Nyct's 207th St Yard Floodwall

    By Christian L. Escalera

    Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth

  • DFI
    Contractual Pitfalls To Avoid With ACIP Piles

    By William Babcock

    Augered, Cast-In-Place (ACIP) piles can be an economical, reliable, versatile foundation system. They have also been a part of projects that were behind schedule and the subject of lawsuits. The ACIP

    Jan 1, 1997

  • DFI
    Piling Design and Construction Codes and Standards for Buildings A United States Perspective

    By Rudolph P. Frizzi

    "Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu

    Jan 1, 2014

  • DFI
    Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles

    By Norm Kirk, Robert Bittner

    "The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca

    Jan 1, 2017

  • DFI
    Numerical Analysis Of Mono And Group Suction Piles Under Lateral Loadings In Layered Deposits

    By Juhyung Lee

    Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silty

  • DFI
    Challenges And Uncertainties Relating To Open Caissons

    By Fathi Abdrabbo

    Open caissons are used for many geotechnical engineering applications. Open caissons may be used as deep foundation elements bypassing weak soils to tip in firm deeper strata, and in rivers and mariti

    Jan 1, 2012

  • DFI
    The Channel Tunnel Project - Historical Background

    By C. J. Kirkland

    For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains

    Jan 1, 1991

  • DFI
    Helical Pile Foundations at Tangier Island Substation

    By Jeff Wilkinson, Brandon Walter

    "A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp

    Jan 1, 2017

  • DFI
    Geospatial Project Information Management System At Herbert Hoover Dike

    By Jamey Rosen

    A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of

  • DFI
    The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid (cdc8479e-b761-4427-8d26-4088be3d5ab5)

    By Ping Yang, Tian-bin Li, Min-hui Wu

    "The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of

    Jan 1, 2017

  • DFI
    Keynote Lecture 6: Mitsuhiro Shibazaki Jet Grouting

    By Mitsuhiro Shibazaki

    Generally, water-soluble polymers are effective in convergence of water jet ejected from a nozzle as they add viscosity to water. However, excessive additional polymers (added to keep water viscous) c

    Feb 10, 2003

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004

  • DFI
    Hammer-Grout Piles At The Bronx-Whitestone Bridge

    By Ameir Altaee

    Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho

    Jan 1, 2010

  • DFI
    Drilling And Dewatering In An Urban Environmentprivate - Project Description And Location

    By Joel Moskowitz

    In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M

    Jan 1, 1996

  • DFI
    Automated Installation Monitoring For Augercast And Driven Piles

    By Garland Likins

    Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat

    Jan 1, 1999

  • DFI
    Limiting Damage To Historic Structures In New York City, 1981 To Present

    By Andrew J. Ciancia

    The construction of the Pennsylvania Station in Manhattan, the Beaux-Arts masterpiece, was completed in 1910. In financial ruin, the Pennsylvania Railroad Company sold the station in the 1960?s and t

    Jan 1, 2008