Combined Piled Raft Foundation (CPRF) responseBy G. L. Sivakumar Babu, P. Chaithra
"Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration
Jan 1, 2015
-
A Seepage Control Cutoff in an Extreme Saline EnvironmentBy Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy
"Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture
Jan 1, 2016
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:By Alun J. Davies
This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co
Jan 1, 2000
-
Access And Riser Shafts-Detroit River Outfall #2 ? IntroductionBy Edmund J. Cardoza
The Detroit Water and Sewerage Department (DWSD) provides water and wastewater services to the Greater Detroit Metropolitan Area. Sewerage is treated at the DWSD Wastewater Treatment Plant (WWTP) loca
Jan 1, 2001
-
Double Rotary CFA Piles: Performance In Cohesive SoilsBy Michel Bustamante
The occasional substandard performances of continuous flight auger in particular soil conditions have prompted the drilling rig manufacturer to improve the standard CFA in order to reduce its negative
Jan 1, 2002
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016
-
The Soilex Pile SystemBy Erik M. Westerberg
The Soilex Pile combines a slender shaft, for quick and easy installation, with an enlarged pile toe, for high capacity. The key component is the Expander Body, which is inflated by injecting cement g
Jan 1, 2000
-
Behavior of Settlement Reducing Piles under Static and Seismic LoadingsBy Marwa Nabil, Alaa A. Ata
"Recent developments in the analysis of piled rafts has incorporated the load sharing of the raft and the piles to support the superstructure. In the piled-raft system, piles are cast monolithically w
Jan 1, 2016
-
Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian AquiferBy C. Dai, S Raathiv
The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th
Nov 1, 2022
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
The Type Of Wharf Structure On Soft Soil With Undulating Weathered Rock BedBy Sun Shao Xian
The Port of Shekou is situated at Shenzhen Bay on the east side of the Pearl River estuary. Geological condition of the site is quite complicated. On top of the sea bed, there is a layer of soft silt
Jan 1, 1991
-
Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New JerseyBy Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse
"After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus
Jan 1, 2015
-
Influence Of Urbanization And Geology On Deep Foundation Design And ConstructionBy Hiren J. Shah
The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his
Jan 1, 2011
-
Unique Algorithm Which Takes into Account Source Wave Travel Paths When Estimating Absorption Values From DST Data SetsBy Gerald Verbeek, Erick Baziw
Dynamic soil analysis (DSA) in geotechnical practice is intimately related to the capability of measuring the necessary soil properties of shear modulus and absorption. In DSA the methods of analysis
Jan 1, 2019
-
Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley SiteBy Gyimah Kasali
Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)
Jan 1, 2002
-
Numerical Analysis Of The Pile-Enhanced Raft Of The Queen Elizabeth II Conference Centre In London, UKBy Trevor I. Addenbrooke
Stress reducing piles were used for the first time at the Queen Elizabeth II Conference Centre near the Palace of Westminster in London, UK. The inclusion of these piles directly beneath heavily loade
Jan 1, 2002
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
2022 OPA Winner: Mosul Dam Rehabilitation ProjectBy Raffaella Granta
Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo
Oct 1, 2022