  • DFI
    Combined Piled Raft Foundation (CPRF) response

    By G. L. Sivakumar Babu, P. Chaithra

    "Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration

    Jan 1, 2015

  • DFI
    A Seepage Control Cutoff in an Extreme Saline Environment

    By Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy

    "Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture

    Jan 1, 2016

  • DFI
    Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary Displacement

    By Lewis Stansfield

    A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie

    Jan 1, 2000

  • DFI
    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • DFI
    Access And Riser Shafts-Detroit River Outfall #2 ? Introduction

    By Edmund J. Cardoza

    The Detroit Water and Sewerage Department (DWSD) provides water and wastewater services to the Greater Detroit Metropolitan Area. Sewerage is treated at the DWSD Wastewater Treatment Plant (WWTP) loca

    Jan 1, 2001

  • DFI
    Double Rotary CFA Piles: Performance In Cohesive Soils

    By Michel Bustamante

    The occasional substandard performances of continuous flight auger in particular soil conditions have prompted the drilling rig manufacturer to improve the standard CFA in order to reduce its negative

    Jan 1, 2002

  • DFI
    Analysis and Behavior of Double Sheet Pile Cofferdam

    By Kamil Nuzha, Jianchao Li, Bashar S. Qubain

    "The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we

    Jan 1, 2016

  • DFI
    The Soilex Pile System

    By Erik M. Westerberg

    The Soilex Pile combines a slender shaft, for quick and easy installation, with an enlarged pile toe, for high capacity. The key component is the Expander Body, which is inflated by injecting cement g

    Jan 1, 2000

  • DFI
    Behavior of Settlement Reducing Piles under Static and Seismic Loadings

    By Marwa Nabil, Alaa A. Ata

    "Recent developments in the analysis of piled rafts has incorporated the load sharing of the raft and the piles to support the superstructure. In the piled-raft system, piles are cast monolithically w

    Jan 1, 2016

  • DFI
    Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian Aquifer

    By C. Dai, S Raathiv

    The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th

    Nov 1, 2022

  • DFI
    Cooling Water Intake Shafts for the Oak Creek Expansion

    By Edward Jacobsen, Patrick J. Lydon

    "The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake

    Jan 1, 2008

  • DFI
    The Type Of Wharf Structure On Soft Soil With Undulating Weathered Rock Bed

    By Sun Shao Xian

    The Port of Shekou is situated at Shenzhen Bay on the east side of the Pearl River estuary. Geological condition of the site is quite complicated. On top of the sea bed, there is a layer of soft silt

    Jan 1, 1991

  • DFI
    Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New Jersey

    By Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse

    "After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus

    Jan 1, 2015

  • DFI
    Influence Of Urbanization And Geology On Deep Foundation Design And Construction

    By Hiren J. Shah

    The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his

    Jan 1, 2011

  • DFI
    Unique Algorithm Which Takes into Account Source Wave Travel Paths When Estimating Absorption Values From DST Data Sets

    By Gerald Verbeek, Erick Baziw

    Dynamic soil analysis (DSA) in geotechnical practice is intimately related to the capability of measuring the necessary soil properties of shear modulus and absorption. In DSA the methods of analysis

    Jan 1, 2019

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Numerical Analysis Of The Pile-Enhanced Raft Of The Queen Elizabeth II Conference Centre In London, UK

    By Trevor I. Addenbrooke

    Stress reducing piles were used for the first time at the Queen Elizabeth II Conference Centre near the Palace of Westminster in London, UK. The inclusion of these piles directly beneath heavily loade

    Jan 1, 2002

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    2022 OPA Winner: Mosul Dam Rehabilitation Project

    By Raffaella Granta

    Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo

    Oct 1, 2022