Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - SynopsisBy George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Recent Advances in Quiet & Vibration-less Steel Pile InstallationBy R. K. Filip
"Steel bearing piles have long been used to carry high compressive, tensile and lateral loads. Such piles are most commonly tubular or ""H"" profile and are typically installed using percussive techni
Jan 1, 2005
-
Cofferdam Failures ? IntroductionBy Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling FluidBy Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA FinalistBy Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative SolutionBy Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation ProjectBy Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus
A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba
Sep 1, 2022
-
Design And Construction Of The Rion Antirion Bridge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2013
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission LineBy Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Vibration Isolation at the Dana-Farber Yawkey Center: OPA FinalistBy David R. Shields, Michael T. Bracher
"The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca
Jan 1, 2012
-
Behavior of Battered Piles under Lateral Loads in Sandy SoilsBy Jogeshwar P. Singh, Ahmed AlaaEldin, Mohamed Ashour
The presented methodology allows the determination of the response of laterally loaded battered long piles in sandy soils based on the soil-pile interaction. The Strain Wedge (SW) model which was orig
Jan 1, 2018
-
Frequency-Variable Vibrators And Their Application To Foundation Engineering - 1 IntroductionBy K. Rainer Massarsch
In some parts of the world, vibrators are used extensively for different types of foundation engineering projects. If used correctly and in suitable soils then vibratory pile driving for example is ve
Jan 1, 1995
-
Piling The Gateway To EuropeBy Howard Roscoe
Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su
Jan 1, 2002
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Advances In Marine Piling Techniques And New Age Piling MaterialsBy D. Cantali
This paper will be presented in two parts. The first part will present the latest advancements in pile installation techniques using state-of-the-art press-in piling technology by Giken. By pressing i
Nov 1, 2022