Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • IOM3
    Discussion of Mr. James Black's paper on 'Forming a shaft-pillar in thin seams', at the Mining Institute of Scotland's annual general meeting held in Glasgow, 8 April 1916

    Discussion continuing that published in Trans.I.MIn.E ., 1915, vol.L, p.449 and 1916, vol.LI, p.166, included contributions by Smith W., McLaren R., Gibson J., McCreath W., Sneddon J.B., Kirkpatrick J

    Dec 1, 1916

  • IOM3
    High-speed air-compressors for mining work, paper presented at a general meeting of the North Staffordshire Institute of Mining and Mechanical Engineers held in Stoke-on-Trent, 17 January 2016

    By Walshe J. M.

    The slow-speed compressor is giving place to the high-speed type, with its greater economy of material and space; and, where very large units are required, the turbo-compressor is supplying the need.

    Dec 1, 1916

  • IOM3
    Issue on platinum-group element mineralization comprising selected papers from the IAGOD International symposium on mineralization related to mafic and ultramafic rocks held in Orleans, France, 1-3 September 1993

    By D. L. Buchanan, ed. sci.

    The issue comprises 10 contributions on PGE mineralisation, of which 9 were presented at the symposium organised by the IAGOD Commission on Ore Deposits in Mafic and Ultramafic Rocks and the BRGM-CNRS

    Apr 1, 1994

  • IOM3
  • IOM3
  • IOM3
    Economic geology in Europe and beyond II: papers from the meeting held in Keyworth, UK, 13-14 April 1994: mineral deposit modelling with special reference to models for mineral deposits in sedimentary basins

    By ed. comp., S. H. White, A. J. Naldrett, P. R. Simpson

    Peter Simpson's introduction, Tony Naldrett's concluding remarks and discussion by Prof. White of D.M.A. Flight's report of the proceedings are presented from the conference held in Keyworth, UK, in A

    Apr 1, 1995

  • IOM3
    Risk model of planned profit from a surface mining venture

    By R. A. Halatchev

    A risk model for assessment of the uncertainty in the forecasts of the planned profit is developed. It is based on the selling price of the metal recovered from the ore and the production per shift of

    Dec 1, 1996

  • IOM3
    Development of a sensor to measure copper in alloys and matte

    By A. J. Davidson

    A Cu-conducting solid electrolyte was used to develop the sensor. Instead of measuring the potential across the electrolyte from the reference material to the Cu-containing phase, a potential was appl

    Jun 21, 1905

  • IOM3
    Similarity analysis applied to till geochemical data from southwest Finland: geochemical signatures of Vammala and Kylmakoski nickel deposits

    By R. Lahtinen, M. Tiainen, R. Salminen

    The application of similarity analysis derived from regional geochemical mapping data to the location of Ni-bearing intrusions was tested in southwest Finland, where a well-known nickel belt is situat

    Dec 1, 1991

  • IOM3
    Official opening of Tunnelling '94 by Lord Mackay of Ardbrecknish

    By J. J. Mackay

    The Parliamentary Under-Secretary of State at the UK's Department of Transport introduced the symposium, approved its emphasis on environmental planning and the mitigation of environmental impact, dis

    Jun 16, 1905

  • IOM3
    Power draw of wet tumbling mills and its relationship to charge dynamics, part 1: a continuum approach to mathematical modelling of mill power draw; part 2: an empirical appriach to modelling of mill power draw

    The first part describes a model (the C model) based on the motion of the grinding charge. The charge is treated as a continuum, which allows analytical solutions to the equations that are developed.

    Jun 18, 1905

  • IOM3
    Copper Losses in Smelting and Converting

    By R. W. Ruddle

    The present state of knowledge on this subject may briefly be summarized as follows: (1) The copper content of the slag increases with the grade of the matte in contact with it; on the other hand, the

    Jan 1, 1953

  • IOM3
    Comparison of methods for evaluation of true flotation and entrainment

    By V. E. Ross

    A comparison was made of three methods for determining the contributions of true flotation and entrainment during batch flotation tests. In the first method size-by-size recoveries are measured in bot

    Dec 1, 1991

  • IOM3
    Alluvial gold dredging: a case study of effects on groundwater turbidity

    By H. R. Thorpe

    A floating gold dredge operating in coarse alluvial gravels of the Grey River on the west coast of the South Island, New Zealand, generated high concentrations of clay and colloidal particles in the d

    Jun 19, 1905

  • IOM3
    Geology and mineralization at trojan nickel mine, Zimbabwe

    By L. R. Chimimba

    "The Trojan nickel deposit occurs within a pile of ultramafic lavas subjected to a lower amphibolite grade of metamorphism. The lavas form part of the Upper Greenstones (Bulawayan Group) of the Mazoe

    Jan 1, 1984

  • IOM3
    Study of bucket trajectory in automatic scooping with load-haul-dump loaders

    By A. Hemami

    In order to automate the operation of mechanical loaders it is essential to have a knowledge of the forces that act on the bucket and of the trajectory that the bucket should follow. A trajectory for

    Jan 4, 1993

  • IOM3
    River diversions at Aredor mine, Guinea, West Africa

    The Aredor mine employs conventional dragline methods to exploit alluvial diamond deposits. Production began in 1984 with the policy of mining in the terrraces during the wet season and in the river f

    Sep 1, 1991

  • IOM3
    Comparative analysis of toppling behaviour at Chuquicamata open-pit mine, Chile

    By P. Varona, L. Lorig, M. Board, E. Chacon

    Geomechanical factors at the mine are important and will become even more relevant as the pit expands and deepens. To address these demands a team was assembled to collect geomechanical information an

    Apr 1, 1996

  • IOM3
    Mechanism of cut blasting

    By S. P. Singh

    The purpose of the cut is to provide a free face to which the remainder of a development or breasting round can break. The results of field testing in drifts and at a quarry face were used as a basis

    Dec 1, 1995

  • IOM3
    Evaluation of rock properties during cutting by tunnel-boring machine disc

    By V. Krupa, E. Lazarova

    A method is proposed for the continuous calulation of a rock mass in real time while tunnelling with a TBM. Rock properties are investigated through models of the fracture stress under the disc cutter

    Dec 1, 1996