    The Testing of Structures and Structure-combinations to be Applied as Explosive-proof Enclosure

    By C. Heiss, A. Hofmann

    Due to an explosion in an Austrian steel works during the basic oxygen process, the Chair of Mining Engineering and Mineral Economics at the Montanuniversitaet Leoben was assigned with the set-up of a

    Jan 1, 2012

  • ISEE
    Carbon Monoxide Poisoning – Commercial Explosives, Rock Blasting and Construction Work in Inhabited Areas

    By Nadya Michel, Daniel Gros-Jean

    This is a true story. Names have been changed to illustrate the importance and impact of carbon monoxide risk management in explosive blast projects and the community « Honey I’m not feeling good…” “W

    Feb 6, 2023

  • ISEE
    Blasting Results Compared Using Crusher Powder Consumption and Tonnage of Rock Produced

    By Ron Glowe

    This paper shows the potential of a new computer model, using the Glowe-Tech (GT) Tonnage Analyzer program to compare drilling and blasting results. This model uses the crushers and conveyors as measu

    Jan 1, 2005

  • ISEE
    Application of Machine Learning in rock mass characterization for Blasting

    By Javier Illanes, Felipe Moroni

    In recent years, implementation of Artificial Intelligence and Machine Learning model technology has gained ground in almost every aspect of human activities. The mining industry has not been foreign

    Jan 21, 2025

  • ISEE
    Electrodet a New Precise, Reliable, Easy to Use and Cost Effective Electronic Delay Detonator System

    By Noel Dent

    Increasing interest is being expressed in the development and availability of Electronic Delay Detonators throughout the world. Particularly in open-cast mining, the benefits associated with precise,

    Jan 1, 1994

  • ISEE
    Explosives Notified Bodies - For Safety in Europe

    According to the Directive 93/15/EEC, given on 5th of April 1993, all the commercial explosives placed on the market and transfered in European Union and EFTA countries have to be certified and contai

    Jan 1, 2004

  • ISEE
    Predicting Vibration Through Linear-Regression Modelling

    By Anthony Konya, Calvin J. Konya

    The publication, RI8507, from the U.S. Bureau of Mines established an envelope equation that related scaled-distance to peak particle velocity in an attempt to predict ground vibration in the design p

    Jan 1, 2018

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • ISEE
    Journal: 100 Years / The Piercing of The Simplon The Century Magazine New York June 1905 / Driving Headings in Rock Tunnels

    By Robert Hopler

    THIS paper deals specifically with heading-driving as distinguished from the broader term tunnel-driving. A heading is a pilot or path-finder for the main tunnel. Some headings are complete tunnels in

    Jan 1, 2010

  • ISEE
    Human Response to Ground Vibration and Air-Overpressure Due to Blasting in Opencast Non-Coal Mines in India: A Case Study

    By M. Ramulu, A. K. Chakraborty, P. B. Sahu, C. Bandopadhyay, P. B. Choudhury

    Human response to blast induced vibration and air overpressure is an unsolved problem that accompanies excavation process in mining. Pre-assessment and understanding of annoyance due to production bla

    Jan 1, 2004

  • ISEE
    Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well

    Feb 1, 2020

  • ISEE
    Recent Developments Relating to the Certification of Explosives for Sale in European Union Countries

    By D. Pickering, R. Wharton

    The deadline for meeting legal requirements relating to the sale of explosives in the European Union was 1 January 2003. The paper examines the range of materials that have already been certified by t

    Jan 1, 2003

  • ISEE
    Top Hammer Drilling-The Way Things Work

    By William D. Hissem

    For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.

    Jan 1, 1998

  • ISEE
    Flyrock Model Validation and Application

    By C. K. McKenzie

    Presents outline of flyrock model and a field procedure to validate predictions of maximum projection distance. Field results are presented from 13 field tests with two different hole diameters.

    Feb 1, 2020

  • ISEE
    The Truth About Signature Hole Method

    By Thierry Bernard

    Since the signature hole method principle has been described in the 80's, there has always been a lot of controversy about it. The theory is easy to understand but when it comes to apply it for predic

    Jan 1, 2012

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations – Part 3

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Francisco Monteiro, Andrew Palangio, Blessing Taiwo

    This study aims to enhance the integration between blasting and primary crushing operations in quarrying by optimizing the size of oversize and bypass fragments, ultimately reducing energy consumption

    Jan 26, 2026

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    A Five Staged Approach to the Analysis of a Blast from Budget Through to Implementation

    By Stephen Mansfield

    Analysing how accurately a blast design is implemented is one of the cornerstones of a successful operation, and critical for mine optimisation. This paper presents a concept that involves the collect

    Feb 1, 2020

  • ISEE
    TABLE OF CONTENTS 2023 General Proceedings

    By NA NA

    None

    Feb 6, 2023

  • ISEE
    The 8 Millisecond Rule is Dead – Or Is It?

    By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley

    The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t

    Jan 21, 2025